CIVIL ENGINEERING DATABASE
AMERICAN SOCIETY OF CIVIL ENGINEERS
ASCE LIBRARY
All Proceeding Papers /Chapters
The Hydro Business: 1990 and Beyond
Status of Hydropower Development at Corps of Engineers Dams
The Development and Writing of the ASCE/EPRI Hydroelectric Guidelines
Project Evaluation?Don't Miss the Boat
Hydropower Development under the Utility Concept of Least Cost Utility Planning
Determining Hydro Project Dependable Capacity
Important Aspects of Annual Energy Calculation Techniques for Low Head Hydro Power Plants
Quantifying Uncertainty in Hydropower Planning
Joint Economic Evaluation of Pumped Storage in Colorado
An Investigation of a Pumped Storage Hydropower System
Devil Canyon Second Afterbay
Case Study Incremental Approach to Cost Analysis for Improvements to Wise Powerhouse Penstock
IJC Challenges in an Era of Uncertainty
Storage Reallocation in Hydropower Projects of North Georgia
Economic Trade-Off between Hydropower and Other Competing Water Uses: A Case of Coteau Creek Station
Rule Curve Operation at Terzaghi Dam to Pass the Probable Maximum Flood
Simulations of Multireservoir System Operation
First 10 Years of Operation of <italic>The La Grande Hydroelectric Complex
Sediment Evacuation System for Impounded Rivers
Some Pertinent Considerations in Dam and Reservoir Design
How Many Years to Fill with Sediment, a Sediment Study of Lake Powell on the Colorado River
Hydrometric Networks Serving Hydropower Needs
Efficiency and Vibration Testing
Thermally Developed Blade Stresses and Cavitation Damage
Vibration Measurements in Condition Monitoring
Automation of Existing Dam Control Schemes
World Class Manufacturing and Hydro-Electric Production
Trashrack Cleaning?A Job Requiring Utmost Care
Upgrading Trashraking Equipment During Scheduled Maintenance Outages
Management System for Power Plants Tecaid Maintenance System
Underwater Tunnel Inspection by Virginia Power Using a Submersible Robot
Challenging Site Conditions Lead to Unusual and Innovative Powerhouse Design Features
Intake Towers and Outlet Tunnels Adapted for Hydro
Design and Construction of the Moose River Hydroelectric Project
Uplift under Concrete Dams on Rock
Uplift Pressures in Existing Concrete Dams
Uplift Pressure below Gravity Dams on Rock
Effect of Seepage in Cracks in Older Gravity Dams
Lopez-Angostura Power Tunnel
Tunnels and Vertical Shafts for Pumped-Storage
Design of Steel Tunnel Liners
Tunneling through an Existing Concrete Masonry Dam
Cofferdams: An Integral Part of Small Hydro Design
China's Ertan Hydroelectric Project
Design Considerations for a Penstock Located in an Outlet Tunnel at the Jennings Randolph Dam in West Virginia
Design of Isolated Small Hydro Stations
Flashboard Alternatives Including Rubber Dams
The Modification of Leroy Anderson Dam
Analysis and Rehabilitation of Ambursen Dams
Dam Rehabilitation and Fish Lift Design at the Pejepscot Hydroelectric Project
A Comparative Hydraulic Model Study of an Orifice Spillway
J. C. Boyle Hydroelectric Project Spillway Model Study
Flow Characteristics in an Irregular Spillway Model
Freeboard Allowances for Chute Spillways
Modeling a Small Side Channel Spillway-Model Testing Need Not Be Expensive or Time-Consuming
Hydraulic Model Studies - Sidney A. Murray Jr., Hydroelectric Plant
Physical Model Study of New York State Dam
A Design Parameter Study of Turbine Draft Tube by Viscous Flow Analysis
Moose River Air Chamber Design and Performance
Hydraulic Model Tests of Flow around Penstock Suspended inside the Tunnel for Design of a Small Hydro
Spillway Crest Development through Model Testing on Chenderoh Ambursen Dam
Safety Evaluation of PG&E Dams
Ghost Dam Safety Evaluation
Case Study Safety Evaluation of the Existing Wise Powerhouse Penstock
Hydraulic Features of Canyon Lake Hydropower Plant
Mitigation of Ice Effects at Hydroelectric Intake Structures
Relicensing: The New Rules of the Game
Compliance Administration in the Office of Hydropower Licensing
Public Safety through Cooperation
Licensing the Moose River Hydroelectric Project
The Renovation of the Mechanicville Hydroelectric Station
Effects of the Environmental Approval Process on Project Scheduling and Economics
Negotiating with State and Federal Fish and Wildlife Agencies
Licensing in the 1990's: Can FERC Be a One-Stop Shop?
FERC's Experience in Analyzing Cumulative Impacts
<italic>The Direction of FERC's Envorcement Program
Extensive Civil Penalities Apply - FERC Takes Aim at Hydro Operators' Heads
Optimum Use of the Water Resource a Factor in the Hydroelectric Relicense Process
Overview of EPRI's Hydro Program
New Clues to PMP
EPRI's Hydro Relicensing Strategy
Utility Options for Meeting Dissolved Oxygen Limits for Hydroelectric Power Plant Discharges
Fishery Assessments at Hydroelectric Projects Using Electrofishing, Nets, and Hydroacoustics
Managing the Columbia River to Meet Anadromous Fish Requirements
Radio Telemetry as a Tool for Fisheries Mitigation
Hydropower and Fish Passage Impacts
Improvement of Dissolved Oxygen Levels at Shepaug Hydro Station
Water Quality Studies for Hydro Licenses
Tailwater Management for Beneficial Uses
A Water Quality Impact Analysis of a Hydropower Facility
Balancing Hydropower Development in the Ohio River Basin
Regional Rivers Resource Assessment as a Tool for Hydropower Planning and Policy: The Pacific Northwest Rivers Study
Using IFIM at the Upper Greenwich Project and Other Hydropower Developments
Geology Related Construction Problems at the Urugua-i Hydroelectric Project
Clay Joints in the Foundation of Dkhila Dam
Newfoundland's First Arch Dam Construction Versus Climate
The Groundwater Studies for the Harrisburg Hydroelectric Project
An Evaluation of the Applicability and Cost of Polyester Resin and Cementitious Grouts for the Installation of Rock Anchors at Hydro Projects
Geology and Hydrofacture, Moose River Power Tunnel, New York
Design and Installation of Prestressed Rock Anchors for Penstocks at the Sheldon Springs Project
In-Situ Shear Strength Testing
HYOPS?Maximizing the Value of Your Hydro River System
Optimization of Power Production Based on Efficiency Data
Instream Flow and Energy Production Studies for Hydro Relicensing
Computerized Measurement of Turbine Flow and Performance, Including Penstock Protection
Financing and Marketing Feasibility Tests for Proposed Federal Hydroelectric Power Projects
Evaluation of Hydro Facilities for Sale to Another Utility
Evaluating Financial Performance of Public and Private Firms Involved in Hydropower Development
Capital Cost Modelling for Micro-Hydro Appraisal
New Martinsville Hydroelectric Project
Jim Falls Hydro Redevelopment Project Construction
Bonneville I Powerhouse Station Service Unit Rehabilitation
The Construction of the Sidney A. Murray, Jr. Hydroelectric Power Plant
Vertical Axis Hydro Turbines for Off Grid Installations
The Use of Interior Guide Tube in Cross Flow Turbines
Characteristics of the Independent Turbine Testing Facility
Feasibility, Licensing and Design: Bradley Lake Hydroelectric Project
Retrofitting of Hydro Electric Generators with Bus Fed Solid State Excitation Systems
Trouble-Shooting Large Hydroturbine Bearings
Hydroelectric Generator Rewinding Pitfalls and Means to Ensure Success
Problems Associated with Large Hydro Generators
Optimizing Joint Load Control for Hydroelectric Plants
Electrical and Mechanical Design, Commissioning, and Performance of the Moose River Hydroelectric Project
Efficiency Monitoring Yields Large Revenue Gains
Understanding Generator Static Excitation System
Replacement of Computer Control at John Day Powerhouse
Devil Canyon Powerplant Enlargement Project: Electrical Design Problems and Challenges
Distributed Control Applications for Utility Hydroelectric Plants
Programmable Logic Controller Based Governor/Plant Controller
Torsion Rigid Gates and Their Hoisting Mechanisms
Critical Features of Custom Design Hydro Gates
Crest Gates Design for Upper Mechanicville
Oil Hydraulic Design for Turbine Control
Considerations to Be Taken in the Design of Speed Increasers for Hydroturbine Service
Vibration Problems of Penstock Piping for a Vertical Tubular Hydraulic Turbine
Runner Induced Penstock Vibrations
Turbine Runner Procurement for the Robert Moses Niagara Power Plant Upgrade
Development of High Specific Speed Pump-Turbines
Yacyreta Hydroelectric Project Turbine Design
Hydro Turbine Submergence
Uprating, Modernization and Automation of a Vertical Francis Turbine Generating Unit
Design Data of Kaplan and Bulb Turbine Units
Computer Aided Design of Small Hydro Turbine?Phase II
Update: Ozark-Webbers Falls Turbines
Design and Installation Concepts for High Capacity Pump/Turbines
Reduced O&M Costs through Better Metallurgy
Turbine Improvements through Model Testing, a Case Study
Upgrading Open-Wheel Pit Hydro Plants with Modern Submersible Hydroturbines
Field Efficiency Tests of a Large Pump-Turbine
Murray?Commissioning Maxi Hydro with Mini Flow
Pit Turbines, an Economical Solution for Low Heads
65 MW Bulb Turbine Generating Unit for Tadami Project
Acoustic Flowmeter/Efficiency System Installation at the Niagara Power Project
Model Tests for Six-Jet Vertical Pelton Turbines for Bradley Lake Hydroelectric Project
Field Efficiency Testing of Hydroelectric Turbines
Turbine Efficiency Measurements by the Pressure-Time and the Current-Meter Method at Paugan
Design and Efficiency Testing of a Cross-Flow Turbine
Hydropower Development at Corps Lakes in Texas
Planning and Operation of Hydropower Development on a Navigation System, a Case Study
The High Line Canal Hydroelectric Project: Micro Hydro for a Macro Utility
320 KW Hydro Power Plant for Tenwek Hospital, Kenya, East Africa
Turnkey Hydropower at St. Cloud
Nanpil River Hydropower Project
Case Study in the Rehabilitation of a Pumped/Storage Installation - Salina Powerhouse Grand River Dam Authority
Devil Canyon Powerplant Enlargement
Manicouagan 5?Additional Capacity Project
Harnessing the Allegheny: Four Low-Head Projects
Siphon Penstock Installations at Hydroelectric Projects: A Survey of Design, Construction and Operating Experience
Crescent and Vischer Ferry Hydroelectric Redevelopment Projects
Paradise River, a Challenging Small Hydro Development
A Non-Federal Development at a Federal Project
Harnessing the Snake: A Construction Viewpoint
Pumping System Permits Diversion of Water River Dam
Buffalo Bill Dam Modifications?Modification of an Existing Bureau of Reclamation Facility to Increase Power Generation
Analyses of the Lower San Fernando Dam Failure
Analysis of Concrete Gravity Dams Using Microcomputers
Transient Analysis of the Finchaa Hydroelectric Project
Hydropower Analysis Using Electronic Spreadsheets
FERC Licensing: The Water Resources Engineers Role
Modeling Sedimentation Problems at Hydro Developments
Analysis of Unsteady Flows in Irrigation Canals Due to Load Rejection in Hydroelectric Project
Knowledge-Based Expert System for the Real-Time Operation of Reservoir Systems
Implementation of a General Purpose Site Monitoring Network
Recent Developments in Computer Based Control Systems for Hydro Power Control
Successful Behavioral Devices for Fish Protection
Evaluating Uplift Pressures for Concrete Gravity Dams
Visualization of Flow Phenomena in a Hydraulic Turbine Based on 3D Flow Computations
Tarbella?Third Extension Project Units 11 to 14: 440 MW Francis Turbine Design
Experience with the Application of Fully 3D Potential Flow Analysis to Runner Design
Fluctuating Pressure Measurements on a Large Hydro Turbine
Digital Data Acquisition and Performance Testing of Hydroelectric Equipment
Renewal of the Burt Dam Generating Station
Turbine Conceptions for Low Heads and Their Application in US Hydro Power Stations
Licensee Tort Liability and Regulatory Overreaching