Renewal of the Burt Dam Generating Station
by Stuart J. McVey, Barber Waterpower Products Ltd, Canada,Document Type: Proceeding Paper
Part of: Waterpower '89
Abstract:
The present redeveloped hydro facility operates as a 300 kW run-of-river station automated by a head pond level controller which adjusts turbine setting to match available river discharge. The new turbine was designed to fit into one of the existing 1250 kW turbine pits which consisted of a vertical Francis runner contained within a concrete semi spiral case. The focus of this paper is to describe in detail the design of the replacement turbine and the retro fit associated with this project.
Subject Headings: Turbines | Power plants | Hydro power | Hydraulic design | Rivers and streams | Dams | Water discharge | New York | United States
Services: Buy this book/Buy this article
Return to search