Cleanup on a Large Scale
The San Gabriel Basin yields 200,000 ac ft of groundwater a year from 400 supply wells. This water makes up 95% of the Valley's water supply. Already 30% of the water pumped...

Sewers Get a Breath of Fresh Air
Domestic sewage pump stations and treatment facilities have long been plagued by corrosion and odor problems caused by hydrogen sulfide. It is also extremely toxic. Sulfide production...

A Simulation/Animation of an Inland Railway Container Terminal
The Container Terminal Model (CTM) comprises a batch computer simulation model and interactive graphics animation package. The model has been developed to aid engineers and transportation...

Water Supply System Rehabilitation
This report was prepared to assist practicing engineers meet the challenge of rehabilitating old drinking water systems, many of which have been in existence for over 100 years and are...

Criteria for Selecting Turbine-Pumps Used in Mini-Hydro Power Units
The present paper is aimed at studying turbine-pump units operating at low heads. The proposed methodology is based on the global matching of the turbine and the pump so that both will...

Evaluation of a Pump-Storage Hydropower Facility
This paper summarizes the findings of the evaluations conducted by faculty of the University of Missouri and outside consultants regarding the downstream effects of Harry S. Truman Dam...

Phased Pumped Storage Planning and Site Evaluation
A phase process of site evaluation provides for an efficient use of resources while supporting the necessary level of detailed investigation. This paper describes the phased siting process...

The Corps of Engineers' New Hydropower Manual
The Corps of Engineers has recently completed a new Engineering Manual (EM), which outlines procedures used for the evaluation of hydropower projects. It will serve as the basic Corps...

Micro PAT-Synchronous Generator Unit for Isolated Power Supply at Sultan Project Dam
The paper describes a unique application of a micro-PAT Unit installation utilizing downstream release flows for providing an isolated power supply at the Jackson (Sultan) dam in Washington...

Grand Coulee Pumping/Generating Plant
The paper discusses the Grand Coulee Project history, including a brief review of landmark dates and events. Major general features of the Project are covered, including civil works, mechanical...

Blue Marsh?A Modular Hydroelectric Project
The Blue Marsh Hydroelectric Project will be the first complete application of concepts developed in several research studies of modular hydroelectric power plant components. The Department...

Development of the Standardized Francis Turbine
Initial machine selections to address higher head sites included small custom Francis turbines and standard pumps running in the turbine mode. As the former proved too costly and the latter...

Rehabilitation of a Pump/Turbine
Between 1964 and 1968, eight 212 in pump discharge diameter Baldwin-Lima-Hamilton vertical pump/turbines with Westinghouse motor/generators were installed in Philadelphia Electric Company's...

Oxygenation of Releases from Richard B. Russell Dam
In July 1972, the Georgia Department of Natural Resources requested the formation of a technical committee to analyze the water quality matters relating to the Russell project. Studies...

Preventing Fish Mortality at a Large Pumped Storage Plant
A field study program was initiated at the Truman Project to obtain a better understanding of which fish species in the tailrace area would be most susceptible to turbine passage, determine...

Independent Review of Truman Dam Operation
The Truman Dam in Missouri was constructed by the Army Corps of Engineers in 1979 as a pumped-storage facility. Due to fishkill and other controversies, the pumpback feature of the project...

Spanning Urban Obstacles
Extension of Pittsburgh's Crosstown Expressway is a � mile portion of a massive $500 million urban highway now under construction. The extension is a complex of five roadways...

Lift Station Design
This article describes a computing basics program that calculates flows in sanitary or storm sewage lift station. The program was written to aid in design of duplex sanitary or storm sewage...

Back on a Full Speed Track
A $30 million rehabilitation project is transforming a Massachusetts rail line that shows its age and poor maintenance history. Rehabilitating the line from Bristol County, Mass. to Hyannis...

The Mile High Dream
For the 1986 Tall Buildings Conference in Chicago, a group of experts studied the implications of a mile high skyscraper to be built of concrete. It is 500 ft square at the base, designed...

 

 

 

 

Return to search