Phased Pumped Storage Planning and Site Evaluation
by Charles M. Stover, Alabama Power Co, Birmingham, AL, USA,David E. Miller, Alabama Power Co, Birmingham, AL, USA,
Document Type: Proceeding Paper
Part of: Waterpower '85
Abstract:
A phase process of site evaluation provides for an efficient use of resources while supporting the necessary level of detailed investigation. This paper describes the phased siting process developed by Alabama Power Company from preliminary site identification through intensive geologic, hydrologic, and environmental studies. The direction of these studies was to maximize the use of intracompany expertise and resources through a project management approach, with individual departments functioning within existing organizational structure. The large amount of data collected and evaluated has produced a high level of confidence in identifying a viable site. Equally important, the expected time of construction has been reduced with an expected corresponding reduction in costs.
Subject Headings: Hydro power | Site investigation | Power plants | Electric power | Pumping stations | Energy storage | Construction sites | Alabama | United States
Services: Buy this book/Buy this article
Return to search