U.S.-China's Cooperation in Unified Resource Development
This paper reports on activities between China and the United States involving exchange of technical expertise and project development. The paper focuses on how unified resource development...
The Global Outlook for Additional Hydropower Use
The present installed capacity of hydropower, worldwide, is nearly 400,000 megawatts which provides approximately 25 percent of the electricity generated. Extensive studies of the 86-Nation...
HydroMAX; Computerized Hydropower Scheduling
The New England Power Exchange (NEPEX) is currently using the HydroMAX Program to schedule daily hydropower operations for the 17 stations in the 11,250 square mile Connecticut River Basin....
Interactive Simulation of Hydropower Systems
This paper describes a new educational technology that has proven extremely effective in introducing both technical and lay persons to the operational principles, management alternatives,...
Generic Power System Stabilizer Design
The object of this paper is to describe the design considerations of a microprocessor based power system stabilizer operating through excitation control as applied to a multi-unit pumped...
Efficient Small Hydroelectric Plant Operation
This paper presents a review of operating and maintenance alternatives for small scale hydroelectric plants. The cost of operating a hydro project is largely determined by decisions made...
Optimal Dispatch of Hydroelectric Systems
This paper presents a reliable and computationally efficient method for solving the optimal hydro dispatch problem. Moreover, this method guarantees a true optimal solution when the units'...
Increasing Hydropower Operating Efficiency
A method is described for determining the most efficient use of hydro units in a multiple unit hydro plant. In a multi-unit plant enough flexibility exists to load a chosen set of units...
Quantifying the Maximum Capability of Hydroplants
A procedure was developed to quantify the maximum hydropower capability. This procedure basically consists of two steps: dividing the total available water into weekday and weekend components;...
Hydro System Enhancement: TVA's Comprehensive Hydropower Program
The Tennessee Valley Authority's Comprehensive Hydropower Program is systematically identifying opportunities for increasing hydroelectric generation in five areas: small...
Independent Review of Truman Dam Operation
The Truman Dam in Missouri was constructed by the Army Corps of Engineers in 1979 as a pumped-storage facility. Due to fishkill and other controversies, the pumpback feature of the project...
HYPOS?Hourly System Hydropower Scheduling
HYPOS (Hydro Power Scheduling) is a modification of the program HYPO as presented at Waterpower 81. HYPOS is an interactive system which allows schedulers to assign hourly power generation...
Hourly Scheduling Model for Multi-Unit Hydro Facilities
A computer model for determining hourly releases and generation for multi-unit hydropower facilities is described. The purpose of the model is to disaggregate daily release volumes (either...
Impacts of Indexed Sequential Hydrological Modeling on Hydrogeneration Capacity Estimation
Indexed sequential modeling (ISM) has been proposed by the Western Area Power Administration as an alternative approach to developing firm marketable capacity (i. e. , project dependable...
Planning of Hydropower Development in Hydrothermal Systems by Capex
This paper discusses the power generation expansion model CAPEX in which provisions are made that specifically account for the distinct characteristics of hydropower. The model determines...
Modeling a Real-Time Reservoir Operation for Hydropower Resources Analysis
This paper deals with modeling the operation of two reservoirs in tandem in order to determine energy gain at the downstream plant due to the regulation provided by the upstream reservoir....
Water Availability for Energy Development in the Upper Colorado River Basin
The Bureau of Reclamation is investigating, for planning purposes through hydrologic determination, the total allowable depletion level in the Upper Colorado River Basin. The Colorado...
The Benefit/Cost Ratio of a Physical Model Study
The discussions of a physical model study often appear first in the Federal Energy Regulatory Commission ('FERC') consultation process and when appearing later...
Hydroelectric Project Design Using Microcomputers
The main issue in the first stage of a hydroelectric project is to assess the influence of hydrologic parameters on design and optimum sizing of the installation and on future energy production....
Hydro Systems Evaluation on Personal Computers
The programs for selecting the equipment and determining the average annual energy have been separated from the detailed financial analysis. The BASIC language was selected for the first...