Unique Civil Engineering Features of the Balsam Meadow Pumped-Storage Project
The Balsam Meadow Pumped-Storage Project for the Southern California Edison Company is located in the Sierra Nevada Mountains approximately 55 miles northeast of Fresno, California. The...
The Bath County Pumped Storage Project
Virginia Power and the Allegheny Power System will introduce an important new peaking power service in late 1985, when the first unit of the Bath County Pumped Storage Station becomes...
Genesis of a Federal/Non-Federal Planning Study
This paper presents the course of action the Bureau of Reclamation undertook to develop an appropriate joint Federal/non-Federal planning process for a major pumped storage project. It...
Piedra Del Aguila�New Hydropower for Argentina
Construction commenced in early 1985 on the 1. 0 billion Piedra del Aguila Hydroelectric Project on the Rio Limay about 1200 km (750 mi) southwest of Buenos Aires, Argentina. The project...
Evaluation of a Pump-Storage Hydropower Facility
This paper summarizes the findings of the evaluations conducted by faculty of the University of Missouri and outside consultants regarding the downstream effects of Harry S. Truman Dam...
Phased Pumped Storage Planning and Site Evaluation
A phase process of site evaluation provides for an efficient use of resources while supporting the necessary level of detailed investigation. This paper describes the phased siting process...
The Corps of Engineers' New Hydropower Manual
The Corps of Engineers has recently completed a new Engineering Manual (EM), which outlines procedures used for the evaluation of hydropower projects. It will serve as the basic Corps...
Friant Power Project: Design and Construction?Non-Federal Power at a Reclamation Facility
Friant Dam, Millerton Reservoir, provides the principal water supply for the Friant Division Central Valley Project of the U. S. Bureau of Reclamation (Bureau). The dam is a 319-foot high...
Construction of Yellowtail Dam & Power Plant 63-65
The Yellowtail Unit of the Missouri River Basin project is located on the Bighorn River in south central Montana. The key feature of the unit is Yellowtail Dam which rises 525 ft. between...
Roller Compacted Concrete and Tunnel Boring Machines?Two Tools for Designers and Planners
Two tools that have come into use fairly recently are roller compacted concrete and tunnel boring machines. These new tools can significantly affect the ability to make new projects cost...
The Sand Bar Hydroelectric Project: A Case History
The Sand Bar project's major features include a reinforced concrete intake structure; 3. 5 miles of twelve foot diameter hard rock tunnel; a reinforced concrete powerhouse...
The Paerau Gorge Multipurpose Scheme
The Paerau Gorge Power Scheme is part of a multipurpose scheme supplying irrigation water and electricity to the Central Otago region of the South Island of New Zealand. This paper describes...
The Sultan River Hydroelectric Project
It took almost 70 years and required over 100 separate local, state and federal permits, but in June 1984, development of the Sultan River was finally completed for the multi-purpose use...
The Hrauneyjafoss Hydroelectric Project in Iceland
The Hrauneyjafoss Hydroelectric Project located in south central Iceland about 100 miles east of Reykjavik was constructed during 1978 to 1982. A maximum gross head of 295 feet is developed...
Retrofitting Outlet Works of Existing Dams for Hydropower
This paper deals with three small hydroelectric plants installed at existing dams in California with moderately high heads (about 200 feet). In each case there was an overriding need to...
Power Development at Buffalo Bill Dam
Buffalo Bill Dam is on the Shoshone River in northwestern Wyoming near the city of Cody. The dam is a 325-foot-high concrete arch facility with a crest length of 200 feet. The dam was...
Power Value Determinations
Past and current federal methodology and procedures in power value determinations are presented for consideration by Western Area Power Administration (Western), U. S. Department of Energy...
Financing Hydro Projects
STS Consultants, Ltd. is a consulting engineering firm with expertise in the Hydraulics/Hydrology area. Boulevard Bank is a major commercial bank in Chicago, Illinois. This paper elaborates...
Financial Engineering for Small Hydropower Development
Despite the current impact of new tax laws, there are some creative approaches that the engineer and banker can use to assist development teams in successfully completing high-quality...
Current Financing Trends in Hydroelectric Development
The paper presents the author's view of current financing trends in the hydroelectric project development industry. These events are described in the context of the author's...