Retrofitting Outlet Works of Existing Dams for Hydropower
by Hugh M. Brown, Tudor Engineering Co, San Francisco, CA, USA,Document Type: Proceeding Paper
Part of: Waterpower '85
Abstract:
This paper deals with three small hydroelectric plants installed at existing dams in California with moderately high heads (about 200 feet). In each case there was an overriding need to maintain existing project discharges. The need to adapt to the existing project requirements influenced the design of the power plants, and called for special conditions to be imposed on the construction contractors.
Subject Headings: Power plants | Hydro power | Electric power | Dams | Construction methods | Rehabilitation | Infrastructure construction | California | United States
Services: Buy this book/Buy this article
Return to search