Uncertainty Analysis of Field Turbine Performance Measurements
This paper presents comprehensive uncertainty analyses of two different flow measurement methods for field tests on turbines. The 'water to wire' efficiency was...

Rim-Drive Turbine for Low Head Applications
A turbine design and testing program was undertaken with the objective of developing a standardized turbine/generator arrangement that would be well suited to the 10 to 30 foot head range....

Evaluation of a Pump-Storage Hydropower Facility
This paper summarizes the findings of the evaluations conducted by faculty of the University of Missouri and outside consultants regarding the downstream effects of Harry S. Truman Dam...

Phased Pumped Storage Planning and Site Evaluation
A phase process of site evaluation provides for an efficient use of resources while supporting the necessary level of detailed investigation. This paper describes the phased siting process...

The Corps of Engineers' New Hydropower Manual
The Corps of Engineers has recently completed a new Engineering Manual (EM), which outlines procedures used for the evaluation of hydropower projects. It will serve as the basic Corps...

Micro PAT-Synchronous Generator Unit for Isolated Power Supply at Sultan Project Dam
The paper describes a unique application of a micro-PAT Unit installation utilizing downstream release flows for providing an isolated power supply at the Jackson (Sultan) dam in Washington...

Grand Coulee Pumping/Generating Plant
The paper discusses the Grand Coulee Project history, including a brief review of landmark dates and events. Major general features of the Project are covered, including civil works, mechanical...

Blue Marsh?A Modular Hydroelectric Project
The Blue Marsh Hydroelectric Project will be the first complete application of concepts developed in several research studies of modular hydroelectric power plant components. The Department...

Development of the Standardized Francis Turbine
Initial machine selections to address higher head sites included small custom Francis turbines and standard pumps running in the turbine mode. As the former proved too costly and the latter...

Analyses and Field Tests for Hydraulic Transients Sultan Hydroelectric Project
Two in-line Francis units with their long discharge conduit and bypass valves present some unique problems in controlling hydraulic transients in this system. The problems were compounded...

Analysis and Testing of Transient Pressures at Camp Far West Hydroelectric Project
The objective of this paper is to present a comparative discussion of the results of theoretical analysis of transient pressures and of field tests performed on the Camp Far West Hydroelectric...

Evaluation of Liquefaction Potential of Anderson Ranch Dam
This paper contains a description of a liquefaction evaluation of the alluvial foundation soils at Anderson Ranch Dam, which was performed as part of the USBR's program of...

Hoover Dam Earthquakes Reconsidered
In 1936 and 1937 as the water rose behind Hoover Dam, earthquakes were felt in the Boulder City area and as far away as Las Vegas. Interest in induced seismicity was renewed in 1967 with...

Changing Stability Criteria: Effect on Older Dams
Many of the dams on the Georgia Power Company system were designed and constructed in the early 1900's. Changes that have occurred in stability criteria since construction...

Dam Safety Relating to Merwin and Yale Hydroelectric Projects
This paper describes the safety investigations performed to evaluate the dams, associated with the Merwin and Yale Hydroelectric Projects, for the effects of severe floods and earthquakes....

Rehabilitation of a Pump/Turbine
Between 1964 and 1968, eight 212 in pump discharge diameter Baldwin-Lima-Hamilton vertical pump/turbines with Westinghouse motor/generators were installed in Philadelphia Electric Company's...

Oxygenation of Releases from Richard B. Russell Dam
In July 1972, the Georgia Department of Natural Resources requested the formation of a technical committee to analyze the water quality matters relating to the Russell project. Studies...

Preventing Fish Mortality at a Large Pumped Storage Plant
A field study program was initiated at the Truman Project to obtain a better understanding of which fish species in the tailrace area would be most susceptible to turbine passage, determine...

Generic Power System Stabilizer Design
The object of this paper is to describe the design considerations of a microprocessor based power system stabilizer operating through excitation control as applied to a multi-unit pumped...

Independent Review of Truman Dam Operation
The Truman Dam in Missouri was constructed by the Army Corps of Engineers in 1979 as a pumped-storage facility. Due to fishkill and other controversies, the pumpback feature of the project...

 

 

 

 

Return to search