Capacity Increase of Multi-Jet Pelton Turbines
The recent connection to the grid of large capacity thermal stations, to meet the increasing demand, has entailed an evolution in the type of services required from storage plants with...
Maximum-Slew-Rate Nonlinear Control for Improved Transient Response in Hydrogenerators
This paper considers a linearized model for fixed blade turbines. This paper demonstrates that constant gate speed bang-bang control holds potential advantages over current control techniques....
Small Scale and Low Head Hydro Development in Canada: An Overview of Federal Activities and Policy
Through research and development, new small turbines have been tested and a Darrieus type vertical axis hydraulic turbine (VAHT) has been developed and field tested. Manuals for hydrologic...
Planning and Designing the Powerplant at Stampede Dam
Power development at Stampede Dam was complicated due to the uncertainty about future reservoir operation and the need to design for seismic risk while attempting to minimize overall cost....
Development of the Owyhee Dam Hydroelectric Project
The Owyhee Project Power Committee and Owyhee Irrigation District are developing the Owyhee Dam Power Plant, currently under construction in eastern Oregon. The power plant is being constructed...
Criteria for Selecting Turbine-Pumps Used in Mini-Hydro Power Units
The present paper is aimed at studying turbine-pump units operating at low heads. The proposed methodology is based on the global matching of the turbine and the pump so that both will...
The Pelican, Alaska Hydroelectric Station
In August 1983 Pelican Cold Storage directed KPL to install a new 600 kW turbine, synchronous generator, controls and penstock transition section. This new equipment was to fit upon the...
Miramar/Alvarado Hydropower Projects
The San Diego County Water Authority (SDCWA) was organized in 1944 to provide imported water to member agencies in San Diego County. The 24 member agencies supply 90 percent of the water...
Mini Hydro at the Hackett Mills Project
The project includes rehabilitation of a timber crib dam and the first use of a Right Angle Drive turbine in the United States to generate power from the 16 feet of head available at the...
Planning & Execution for Rehabilitation of Large Francis Turbine/Generator Units
This paper highlights some of the constraints in planning and execution of rehabilitation work which must be carried out within an extremely tight schedule, dictated by hydrological considerations...
Turbine Efficiency Loss Associated with Draft Tube Aeration
Draft tube aeration is one method for improving the dissolved oxygen content of hydroelectric discharges. A simple analytical procedure is presented for estimating the loss in turbine...
FEM-Flow Analysis in Hydraulic Turbomachinery Runners
Finite element calculations of the flow through distributor and runner of hydraulic turbomachines are presented. The method is quasi-3D and inviscid, but the deviations from a potential...
Francis Turbine Surge Prediction and Prevention
Every Francis turbine has some range(s) of load where the flow in the draft tube is subject to fluctuations. Various types of surge during 'steady-state' operation...
A New Turgo Turbine in China
In this paper a special runner bucket of the new Turgo turbine is illustrated and a comparison is made between the characteristics of the new Turgo and the ordinary Turgo turbine with...
Rim-Drive Turbine for Low Head Applications
A turbine design and testing program was undertaken with the objective of developing a standardized turbine/generator arrangement that would be well suited to the 10 to 30 foot head range....
A Review of the Cross-Flow Turbine
The historical development of the cross-flow turbine is briefly presented together with a summary of the well-documented one-dimensional theory. Two-dimensional aspects of runner design...
Hydraulic Transients?Helms Pumped Storage Project
Pacific Gas and Electric Company's Helms Pumped Storage project is a large underground hydroelectric development which went into commercial operation in June 1984. Because...
Main Canal Headworks Hydroelectric Project
This project is being installed at the Dry Falls Dam, Coulee City, Washington, adjacent to the Main Canal Headworks which controls the irrigation releases to the Columbia Basin Project....
Piedra Del Aguila�New Hydropower for Argentina
Construction commenced in early 1985 on the 1. 0 billion Piedra del Aguila Hydroelectric Project on the Rio Limay about 1200 km (750 mi) southwest of Buenos Aires, Argentina. The project...
The Paerau Gorge Multipurpose Scheme
The Paerau Gorge Power Scheme is part of a multipurpose scheme supplying irrigation water and electricity to the Central Otago region of the South Island of New Zealand. This paper describes...