Airfield Pavement Management System
This paper describes a comprehensive Pavement Management System (PMS implemented at 24 airports in the kingdom of Saudi Arabia. The PMS development and implementation was completed in...
Highway Maintenance Data Collection: State of the Art
Existing procedures for recording highway maintenance and field inventory data re laborious and time consuming because the information is entered twice - first on standard paper forms...
Traffic Signal Management Utilizing Fiber Optic Cable
Fiber optic cable technology has progressed from the pioneer stage and is becoming a widely accepted method of data transmission. Utilization for traffic signal systems, however, is not...
Automated Generation of NBI Reporting Fields from Pontis BMS Database
Methods to generate National Bridge Inventory (NBI) condition ratings for deck (Field 58), superstructure(Field 59), substructure (Field 60) and culvert (Field 62) from the bridge database...
Modeling the Traffic Flow Impacts of Rehabilitation Activity on Two-Lane Highways
Researchers at the Purdue University have been involved in developing techniques for predicting the operational impacts created by one-way traffic control. These techniques estimate average...
User Identified Short-Term and Long-Term Needs for Pavement Management Innovation
A survey involving 300 practicing engineer's from all over the United States and representing 20 other countries was conducted, concerning ideas and opinions of the priority research needed...
Large Truck Impacts on the Highway Infrastructure: The Bridge Dimension
Recent U.S. studies have explored the productivity gains of longer combination vehicles (LCV's) and their impacts on highway infrastructure. The area least explored is LCV operations and...
An Integrated System for Pavement Management
This paper describes the process of developing an integrated computerized pavement management system (PMS) for the New York State Thruway Authority. The process evolves around the integration...
A Pavement Management System for Port Orange
The city of Port Orange, Florida, with a population of approximately 35,000, initiated an investigation to develop a simple yet comprehensive pavement management system for their 143-mile...
Managing a Bridge Program for Scour
Recent events have focused national attention on the need for States to implement a managed program to determine the scour vulnerability of each of its bridges. Since 85% of all bridges...
Neural Network System for Automated Highway Pavement Inspection
A multi-layer perceptron back propagation neural network based methodology has been developed to process and analyze moire fringes obtained with an automated highway pavement inspection...
Infrastructure Condition Forecasting Using Neural Networks
Condition forecasting models are critical components of any infrastructure management system. infrastructure condition assessed through periodic inspections which assign ratings to various...
Maintenance Management of Power Transmission Lines
An adb-based maintenance management system, KUHA, was developed in Finland to enable more efficient maintenance of power transmission lines. The system is used for strategic planning in...
Planning Maintenance and Rehabilitation Activities for Local Railroads
This paper presents a structured approach for planning annual and long range (multi-layer) maintenance and rehabilitation (M&R) activities for local railroads. A method is presented...
An Application of MCDM to Product-Based Pavement Management
The Finish National Roads Administration is currently developing it's organization to be more object-oriented and profit-making. This renewal implies to so called product-approach. In...
Uncertainty in Economic Evaluation of Upgrading Gravel Surface Roads
Many highway links in the world are still gravel surfaced. As traffic volumes increase, the demand for upgrading these surface also increases. The challenge to highway infrastructure management...
Comparison of Aqueduct Reconstruction & Tunneling
The Massachusetts Water Resources Authority (MWRA) is proposing to provide redundancy for the Hultman Aqueduct which transports water over a distance of roughly 27 km. (16.9 mi.) into...
Combining Symbolic and Algorithmic Methods for Capital Budgeting in Highway Rehabilitation
The Pavement Rehabilitation Analysis and Design Mentor (PARADIGM) is a prototype, microcomputer -based, integrated set of interacting expert systems and algorithmic models. This paper...
Transient Performance Model of Asphalt Pavement Deterioration and its Application to Repair Management
The Japanese Ministry of construction has conducted surveys of the pavement surface condition of national highways. This paper describes the evaluation of the performance of asphalt pavement...
Aggregate Quarry Operations?From a Railroad's Perspective
This paper describes a study which shows how a railroad company can ensure receipt of a cost-effective, high-quality aggregate product for ballast by monitoring selected quarry operations....
Return to search