Small Hydro Power in British Columbia
Water Power '87 will be held in the Pacific Northwest. British Columbia is also part of this region and, as such, is also one of the homes of hydro power. To date, we have...
Small Hydro Analysis and Reporting Program
The Ontario Ministry of Energy initiated a project to develop an analysis program based upon metric measures and Canadian costs. The Ministry of Energy of the Province of Ontario has been...
Development of Hydropower Projects on National Forest System Land
The United States Department of Agriculture Forest Service has a major role in hydroelectric developments on National Forest System land. It is charged with managing the land for multiple...
The Uncompahgre Hydropower Project?A Historical Perspective
The process required for developing a potential hydropower site is both well-known and straightforward. It begins with the conception of an idea, and is fulfilled by engineering, economic,...
Studies of Fish Protection Methods at Hydroelectric Plants
Five largely untested but economical fish-protection systems were tested at sites throughout North America. The process of selecting laboratory and field test sites was completed at the...
A Case Study of Hydropower Operation Based on Runoff Forecast
The intent of this paper is to outline a forecast approach developed to enable the operation of power storage projects, and to illustrate from employing the approach that overall system...
Hydrologic Design Methodologies for Small-Scale Hydro at Ungauged Sites
IMP is a microcomputer package for evaluating small-scale hydroelectric power sites in British Columbia. With IMP it should be possible for an experienced hydroelectric engineer to make...
Estimating Streamflow Characteristics for Micro-hydro Sites in Northwestern Oregon
Assessing hydropower potential requires knowledge of the streamflow characteristics at prospective sites. Gaging stations are often unavailable. A method for estimating streamflow characteristics...
Managing the Jim Falls Hydro Redevelopment Project
This paper addresses two of the water management issues involved in the design and construction of the Jim Falls Hydro Redevelopment Project. These issues include selecting the optimum...
An Integrated Site Controller-Network Monitoring System for Small Scale Hydroelectric Sites
Over the past decade more and more small scale hydroelectric power developers have faced the question of the economic feasibility of installing microprocessor based control systems for...
Echo Dam Small Hydrodevelopment
In the mid 1970's, Bountiful City Light and Power began investigating alternative energy sources to furnish power to their distribution system. They engaged the firm of Bingham...
Exploration of Karst Conditions in Central Florida
Walt Disney World, which comprises some 28,000 acres (11,000 ha) in central Florida, is underlain by cavernous limestone and is characterized by karst topography; with distinct low ground...
Evaluation of Reservoir Seepage in Karst Topography
Areas where seepage is likely to occur in the karst environment of the proposed West County Reservoir, Roanoke County, Virginia have been indentified. Solutioning exists in the form of...
Geotechnical Exploration and Site Preparation Techniques for Large Mall in Karst Terrain
A large commercial mall and secondary developments were planned for construction in a karst area near Clarksville, Tennessee. A geotechnical exploration was conducted to evaluate the occurence...
Recent Progress in Coal Ash Utilization and the Effect of Environmental Issues and Regulations
This paper summarizes for civil engineers several publications that help to specify and use coal combustion by-products in construction and other applications in a technically sound, commercially...
Regulatory and Environmental Issues of the Chisman Creek Superfund Site
This paper discusses the regulatory and environmental issues arising from the response to the Record of Decision (ROD) for the Chisman Creek Superfund Site in York County, Virginia. Field...
Application of Bayesian Methods to a Geotechnical Site Investigation in Mississippi
In 1981, the Army Corps of Engineers constructed an ammunition storage area at Bay St. Louis, Mississippi. This storage area is part of the Mississippi Army Ammunition Plant (MSAAP). Prior...
Reliability of Geotechnical Systems Considering Geological Anomaly
Anomaly statistics at a given site are first assessed through Bayesian methodology on the basis of site exploration data. Several methods may be then used to incorporate the anomaly uncertainties...
An Intelligent Design Support System for Computer-Aided Site Development
This research proposes an intelligent design support system (DSS) integrated with a CAD environment for building site planning and development. The DSS is used for providing a good initial...
Sewer Rehabilitation?Metro Chicago
After a number of public hearings in the late 1960's and early 1970's which focused on sewer backup problems in the Sanitary District's separate...
Return to search