Rising from the River
The Corps of Engineers completed construction of a 20 Million cu yd dredged material containment facility in the Delaware River in 1990. The authors examine the performance of the geotextile...

Assessing Effects for Disposal Sites off San Francisco
A simple particle tracking model has been used to estimate the size of deposition footprints and transient turbidity effects in the water column resulting from disposal of dredged material...

Dredging Impacts on Delaware Estuary Tides
This study summarizes historic dredging activities and historic tidal trends in the Delaware Estuary. Since 1910, large-scale dredging and maintenance projects in the Delaware Estuary...

Wind Lake Improvement Plan Dredging Project Wind Lake, Wisconsin
Dredging has been used historically to improve navigation, however, it usefulness as a water quality improvement tool has not been widely proclaimed. Although costly to undertake, dredging...

Management of Dredged Material Placement Operations
Non-linear finite strain consolidation theory is used to predict the settlement of fine-grained dredged material due to self-weight and surcharge-induced consolidation. Finite strain consolidation...

Harborside International Golf and Marina Facility

The Fleets of San Francisco Crippled by Phony Science

Applying Dredged Material to Recreation Area Development

Risk-Based Budgeting for Maintenance Dredging
The U.S. Army Corps of Engineers must estimate the budget required to conduct maintenance dredging at hundreds of sites across the country. The amount of funds needed to do the maintenance...

Risk Management Strategies for Natural, Manmade, and Technological Hazards
The paper summarizes the fourth session of the conference which discussed risk assessment approaches in bio/chemical hazards; specific studies on people's behavior and views of natural...

Calibration of Movable Bed Model for Armant Area
The morphology of the Nile River, in Egypt, is undergoing continuous changes which causes navigation bottle-necks in some local reaches. About 200 km downstream Aswan, at Armant area,...

Reservoir Sediment Removal: Hydrosuction Dredging
Hydrosuction dredging is a relatively little-known method of removing sediment deposits from reservoirs. The method is similar to traditional hydraulic dredging except the difference between...

Sedimentation and Remediation Aspects of Recreation Lakes
Relatively higher rates of silting in Lake Shafer, Indiana during the past few years have been a matter of concern to its owners, operators, and users. Potential causes for observed increases...

Technical Area 5 - Dredging Research Program

The Dredging Research Program Technical Area 3

Analysis of Dredged Material Placed in Open Water

Vessel Positioning, Survey Controls and Dredge Monitoring Systems

Coordinating the Feasibility of a Dredged Material Separation System Using Hydrocyclones for the Maintenance Dredging Operation at Canaveral Harbor, Florida

Unexploded Ordnance (UXO) and Dredging

Innovative Design of a Multiport Diffuser

 

 

 

 

Return to search