Why Not a Microcomputer at Each Construction Site?
This paper first considers some of the issues concerning when (and even whether) such an idea is practical. It then looks at how to increase the likelihood of obtaining the desired results....

Potential Misuse of Construction Scheduling Software
The advent of microcomputers, coupled together with the development of many easy to use and economical scheduling packages, has placed a very powerful tool in the hands of construction...

Integrated Automation for Site Work
Technologically, computer integration can be built around four component systems; (a) a computer system to maintain unified data and control real-time operations, (b) a metrology system...

The Potential Realtime Application of GPS Phase Tracking in Construction Surveying
The potential use of precise Global Positioning System (GPS) phase tracking receivers in a realtime application is discussed in relation to the advancements to date in precise kinematic...

Utilizing On-Site Computer-Based Information Systems
This paper addresses the topic of data base management systems and their use by small and medium-sized construction companies. Specifically, the use of personal computer based software...

Simulation for Construction Planning and Control
A prototype system was created as part of a research project for the U.S. Navy Construction Battalions (the Seabees) and has been given the acronym SEACONS (SEAbee Construction Simulation)....

Poor Communication of Schedule and Cost Control Data Between Construction Site Management and Field Supervision Improved by the Weekly Cost and Schedule Meeting for Direct Labor Supervisors
Poor communication of project control data between construction office and field supervision is a common industry problem brought on by poor understanding and lack of training in communication...

Who Pays for the Unexpected in Construction?A Contractor's Viewpoint
There are two categories of 'unexpected' conditions inherent in a construction contract. The first are what might be regarded as normal construction risk such...

Who Pays for the Unexpected in Construction?An Engineer's Viewpoint
The focus of the discussion is on equity, risk, and defining what is meant by the unexpected in construction. These issues are clearly major elements in the disputes among the several...

A Hazardous Data Explosion
During the 1980s, public concern and government regulations have spawned the huge hazardous waste management industry. But the industry has opened a Pandora's box for site engineers, most...

Bells Under Bells
Chicago's newest office tower is supported on new bells that had to be constructed below existing belled caissons. Existing caisson foundations from a previous structure on...

Pumped-Storage Project Site Selection
The paper presents a case history in the selection of a site for a large pumped-storage project for Oglethorpe Power Corporation. The case history illustrates how a large number of potential...

Equipment Selection and Site Optimization Based on Energy Considerations
Most new hydro plants contribute little or nothing to overall system capacity. Therefore, traditional evaluation techniques based on dollars per installed kilowatt have no relevance when...

Small Hydro Power in British Columbia
Water Power '87 will be held in the Pacific Northwest. British Columbia is also part of this region and, as such, is also one of the homes of hydro power. To date, we have...

Small Hydro Analysis and Reporting Program
The Ontario Ministry of Energy initiated a project to develop an analysis program based upon metric measures and Canadian costs. The Ministry of Energy of the Province of Ontario has been...

Development of Hydropower Projects on National Forest System Land
The United States Department of Agriculture Forest Service has a major role in hydroelectric developments on National Forest System land. It is charged with managing the land for multiple...

The Uncompahgre Hydropower Project?A Historical Perspective
The process required for developing a potential hydropower site is both well-known and straightforward. It begins with the conception of an idea, and is fulfilled by engineering, economic,...

Studies of Fish Protection Methods at Hydroelectric Plants
Five largely untested but economical fish-protection systems were tested at sites throughout North America. The process of selecting laboratory and field test sites was completed at the...

Hydrologic Design Methodologies for Small-Scale Hydro at Ungauged Sites
IMP is a microcomputer package for evaluating small-scale hydroelectric power sites in British Columbia. With IMP it should be possible for an experienced hydroelectric engineer to make...

Estimating Streamflow Characteristics for Micro-hydro Sites in Northwestern Oregon
Assessing hydropower potential requires knowledge of the streamflow characteristics at prospective sites. Gaging stations are often unavailable. A method for estimating streamflow characteristics...

 

 

 

 