Status of Hydropower Development at Corps of Engineers Dams
The Corps of Engineers is the largest single supplier of hydroelectric power in the United States with 74 projects and an installed capacity of 20,839 MW. In addition, 33 Corps projects...
The Development and Writing of the ASCE/EPRI Hydroelectric Guidelines
In the Spring of 1989, the American Society of Civil Engineers (ASCE) and the Electric Power Research Institute (EPRI) jointly published their Civil Engineering Guidelines for Planning...
Rule Curve Operation at Terzaghi Dam to Pass the Probable Maximum Flood
Terzaghi dam is located on the Bridge River, a tributary of the Fraser River. The spillway was originally designed for the 1000-year flood. Probable Maximum Flood (PMF) studies completed...
Simulations of Multireservoir System Operation
Simulation modeling has evolved from a direct examination of operating policies into operational decision support systems, integrated multiple use expansion planning systems and special...
Tunnels and Vertical Shafts for Pumped-Storage
Economic considerations are of primary importance to the planning and designing of pumped-storage in an electrical generation and distribution system. This paper deals with the optimum...
Design of Steel Tunnel Liners
The paper presents a detailed development of the fundamental equations for internal pressure design, considering an elastic interaction between the steel liner and the surrounding rock...
Moose River Air Chamber Design and Performance
The Moose River Hydroelectric Project is a 12.5 MW development located in upstate New York. It employs an underground air chamber to protect the unit and power tunnel from pressure surges...
HYOPS?Maximizing the Value of Your Hydro River System
This paper presents a microcomputer based software system, HYOPS, to optimize the operations of a series of hydro plants on a river system. The model can accommodate up to 10 plants which...
Instream Flow and Energy Production Studies for Hydro Relicensing
A methodology for assessing the effects of alternative flow release scenarios on both aquatic habitat and on energy production was utilized during instream flow studies at a 72-MW hydroelectric...
Computerized Measurement of Turbine Flow and Performance, Including Penstock Protection
The application of computer technology now makes it possible to measure turbine flows accurately, reliably and economically. The measurement is based on the differential pressure produced...
Financing and Marketing Feasibility Tests for Proposed Federal Hydroelectric Power Projects
The Southwestern Power Administration (SWPA), an agency of the Department of Energy, is responsible for marketing the power and energy produced at Federal hydroelectric power projects...
Electrical and Mechanical Design, Commissioning, and Performance of the Moose River Hydroelectric Project
The Moose River Hydroelectric Project is a single-unit run-of-river hydroelectric facility located near Lyonsdale, New York, and was developed by a private firm. The generating equipment...
Replacement of Computer Control at John Day Powerhouse
One of the first projects chosen by the Corps of Engineers for computer control was the John Day Project on the Columbia River. John Day powerhouse was completed in 1971 and has 16 generators...
Programmable Logic Controller Based Governor/Plant Controller
This paper discusses the performance characteristics of the programmable logic controllers (PLC's) is based governor, particularly speed resolution and response times. The...
Vibration Problems of Penstock Piping for a Vertical Tubular Hydraulic Turbine
Excessive vibration amplitudes were experienced in the vertical gated tubular units at the Great Falls Hydroelectric Project located in the City of Paterson, New Jersey. Vibration amplitude...
Design Data of Kaplan and Bulb Turbine Units
Some basic statistical data covering geometrical and energy parameters for Kaplan and bulb turbine units are presented. These data are further compared as specific rations for both units,...
Computer Aided Design of Small Hydro Turbine?Phase II
Ateliers Bouvier have been expanding the use of its computer aided design (CAD) system during these last four years, and the aim of this paper is to present some additional aspects of...
Hydropower Development at Corps Lakes in Texas
This paper examines case studies of hydropower development at Corps of Engineers lakes in Texas. Hydropower development examined includes installations by the Corps of Engineers as well...
Analysis of Concrete Gravity Dams Using Microcomputers
Monenco Consultants Limited has developed a microcomputer program entitled 'DS2' for the stability analysis of concrete gravity dams. This paper discusses this...
Transient Analysis of the Finchaa Hydroelectric Project
An iterative computer simulation procedure called LIQT (Liquid Transient), which performs simulations of hydraulic transients in closed conduit hydro-power systems, is used to estimate...
Return to search