The Construction of the Sidney A. Murray, Jr. Hydroelectric Power Plant
The project, consisting of eight 8.2m bulb turbines rated at 192MW, is located in the State of Louisiana and will use a portion of the water diverted from the Mississippi River to the...
Vertical Axis Hydro Turbines for Off Grid Installations
This paper describes the design, manufacture and testing of a 5 kW floating VAHT for use in tidal, ocean, and river installations. This work is based on the results of research contracts...
Feasibility, Licensing and Design: Bradley Lake Hydroelectric Project
This paper describes the licensing, environmental, engineering, and design aspects of the project. Due to the project's remote location and geological setting, the paper will...
Trouble-Shooting Large Hydroturbine Bearings
Special problems associated with very large thrust and guide bearings and lubrication systems are presented, and cover common trouble spots, with examples. Various large hydroturbine bearing...
Hydroelectric Generator Rewinding Pitfalls and Means to Ensure Success
The failure or success of generator rewinding begins well before the actual rewind, and many of the pitfalls can be avoided if owners take some very important steps prior to the rewind...
Optimizing Joint Load Control for Hydroelectric Plants
This paper discusses a method to minimize water usage at a multi-turbine hydroelectric generating plant. At plants which do not spill water this optimization is directly converted to extra...
Electrical and Mechanical Design, Commissioning, and Performance of the Moose River Hydroelectric Project
The Moose River Hydroelectric Project is a single-unit run-of-river hydroelectric facility located near Lyonsdale, New York, and was developed by a private firm. The generating equipment...
Efficiency Monitoring Yields Large Revenue Gains
This paper presents a Washington Water Power Company program to increase hydroelectric plant operations' efficiency. This increase is due to improved flow, head, and megawatt...
Replacement of Computer Control at John Day Powerhouse
One of the first projects chosen by the Corps of Engineers for computer control was the John Day Project on the Columbia River. John Day powerhouse was completed in 1971 and has 16 generators...
Devil Canyon Powerplant Enlargement Project: Electrical Design Problems and Challenges
Devil Canyon Powerplant is a hydroelectric plant facility of the huge California Water Project. This powerplant is located 5 miles north of San Bernandino. It is currently being enlarged...
Distributed Control Applications for Utility Hydroelectric Plants
In 1984, Washington Water Power began a program to improve monitoring and control systems for hydroelectric plants. The control systems being improved with distributed control equipment...
Programmable Logic Controller Based Governor/Plant Controller
This paper discusses the performance characteristics of the programmable logic controllers (PLC's) is based governor, particularly speed resolution and response times. The...
Torsion Rigid Gates and Their Hoisting Mechanisms
In Europe, installation of modern, steel, 'torsion-rigid', radial (tainter) gates and flaps, operated by one or more hydraulic hoists usually situated at the...
Critical Features of Custom Design Hydro Gates
Large hydro gates are custom designed to suit each particular installation. To prevent overlooking a feature that could lead to future problems, a check list of the numerous features should...
Crest Gates Design for Upper Mechanicville
This paper describes the design of flap-type spillway crest gates for the Upper Mechanicville Project, located on the Hudson River near Mechanicville, New York. These gates are being provided...
Considerations to Be Taken in the Design of Speed Increasers for Hydroturbine Service
The paper discusses the incorporation of a speed increaser specification that is primarily functional yet one that will address the cost, reliability, efficiency, and life requirements...
Runner Induced Penstock Vibrations
During the start up testing of the Sly Creek Power-house a severe penstock vibration was discovered at wicket gate openings above 65%. Subsequent testing revealed that the penstock vibration...
Turbine Runner Procurement for the Robert Moses Niagara Power Plant Upgrade
Procurement of the new runners involved the selection of two manufacturers who have entered into a design competition in which competing models will be tested in an independent hydraulic...
Development of High Specific Speed Pump-Turbines
The operational range of pump-turbines is continually increasing, especially in the direction of high specific speed installation. In this context, high specific speed refers to units...
Yacyreta Hydroelectric Project Turbine Design
This paper provides general information about this major hydroelectric project on the Parana River on the border between Argentina and Paraguay in South America. In addition, some specific...
Return to search