Mechanical Properties of Model Ice Rubble
Experiments were conducted to measure the mechanical properties of bulk ice rubble. Tests were performed under isothermal and plane strain conditions. Fresh water ice blocks were used...
Materials and Member Behavior
Each of the papers in this book covers some aspect of material properties. New developments in cold formed steel are reviewed. The strength, stiffness, and ductility of steel connections...
Engineering Hydrology
The Surface Water Hydrology Committee, ASCE Hydraulics Division, sponsored this first Symposium on Engineering Hydrology. The Symposium was held jointly with the ASCE National Conference...
Ground Water Management
This manual is designed to present an outline of groundwater hydrology, the details of planning for groundwater management, and a process of selection and implementation of management...
Selected Papers from the Chinese Journal of Geotechnical Engineering ?1985
This book contains English translations of 19 articles selected from the Chinese
Capacity Increase of Multi-Jet Pelton Turbines
The recent connection to the grid of large capacity thermal stations, to meet the increasing demand, has entailed an evolution in the type of services required from storage plants with...
Small Scale and Low Head Hydro Development in Canada: An Overview of Federal Activities and Policy
Through research and development, new small turbines have been tested and a Darrieus type vertical axis hydraulic turbine (VAHT) has been developed and field tested. Manuals for hydrologic...
Small Hydropower Potential in Missouri
The hydropower potential of small head plants on the Gasconade River was investigated. Since, it is felt that small head plants will have less environmental impact, thus it will be more...
Planning & Execution for Rehabilitation of Large Francis Turbine/Generator Units
This paper highlights some of the constraints in planning and execution of rehabilitation work which must be carried out within an extremely tight schedule, dictated by hydrological considerations...
The Corps of Engineers' New Hydropower Manual
The Corps of Engineers has recently completed a new Engineering Manual (EM), which outlines procedures used for the evaluation of hydropower projects. It will serve as the basic Corps...
Valuation of System Hydro Additions
The purpose of this paper is to examine the major factors and steps which affect the valuation process of adding hydro power plants to an integrated hydro-thermal generation system. Results...
Safety of Dams Activities in the Bureau of Reclamation Lower Colorado Region
In the Lower Colorado Region of the Bureau of Reclamation (BuRec), there are presently eight BuRec dams and one Bureau of Indian Affairs dam being modified or studied for modification...
Competitive Model Testing for Replacement Runners at the Wells Hydroelectric Project
The Wells Hydroelectric Project, located on the Columbia River, contains ten Kaplan-type turbines. The plant has been in commercial operation since January, 1969. The runners have a long...
Simulation of the Pit 3, 4 and 5 Hydroelectric Project Using the USFWS Instream Temperature Model
The Pit River in Shasta County, California, is the site of the Pit 3, 4, and 5 Project (Project). A two-year Bald Eagle and Fish Study was initiated in March 1983. As part of the overall...
Capacity Planning of Decentralized Small-Scale Hydro Power Plants
Some simple and efficient models are proposed to determine the optimal capacity and the expected energy generation of a decentralized small-scale hydro plant. Both the supply of an isolated...
Hourly Scheduling Model for Multi-Unit Hydro Facilities
A computer model for determining hourly releases and generation for multi-unit hydropower facilities is described. The purpose of the model is to disaggregate daily release volumes (either...
Impacts of Indexed Sequential Hydrological Modeling on Hydrogeneration Capacity Estimation
Indexed sequential modeling (ISM) has been proposed by the Western Area Power Administration as an alternative approach to developing firm marketable capacity (i. e. , project dependable...
Planning of Hydropower Development in Hydrothermal Systems by Capex
This paper discusses the power generation expansion model CAPEX in which provisions are made that specifically account for the distinct characteristics of hydropower. The model determines...
Modeling a Real-Time Reservoir Operation for Hydropower Resources Analysis
This paper deals with modeling the operation of two reservoirs in tandem in order to determine energy gain at the downstream plant due to the regulation provided by the upstream reservoir....
The Benefit/Cost Ratio of a Physical Model Study
The discussions of a physical model study often appear first in the Federal Energy Regulatory Commission ('FERC') consultation process and when appearing later...
Return to search