Power Development at Buffalo Bill Dam
Buffalo Bill Dam is on the Shoshone River in northwestern Wyoming near the city of Cody. The dam is a 325-foot-high concrete arch facility with a crest length of 200 feet. The dam was...

Hoover Dam Plus Fifty Years Equals El Cajon Dam
The completion of El Cajon arch dam on the fiftieth anniversary of the completion of Hoover Dam has given the opportunity to compare design and construction of two concrete arch dams constructed...

Hoover Dam Earthquakes Reconsidered
In 1936 and 1937 as the water rose behind Hoover Dam, earthquakes were felt in the Boulder City area and as far away as Las Vegas. Interest in induced seismicity was renewed in 1967 with...

Arch Dams for Small Hydroelectric Sites
Approximate formulas are developed for the design of small arch dams. These designs, although conservative, frequently allow for economies over other dam types. Considered are: an approximate...

An Overview of Hoover Dam Tunnel Spillway Damage
The Hoover Dam tunnel spillways have provided the Bureau of Reclamation hydraulic laboratories with new and continued opportunities for applied research. During the peak years of the Boulder...

Dam Safety Relating to Merwin and Yale Hydroelectric Projects
This paper describes the safety investigations performed to evaluate the dams, associated with the Merwin and Yale Hydroelectric Projects, for the effects of severe floods and earthquakes....

Renovation of the Shoshone Powerplant, Wyoming
Shoshone Powerplant and Buffalo Bill Dam are located on the Shoshone River approximately 5 miles (8. 1 km) west of Cody, Wyoming. The Powerplant was completed and the first two generating...

Rehabilitation of Victoria Dam
Rehabilitation of a 54-year old thin concrete arch-buttress dam was completed without interruption of power generation using pressure injection of an epoxy adhesive. This paper presents...

Long Term Performance of the Goldstream Creek Bridge
In 1964 the Alaska Department of Transportation and the U. S. Army Cold Regions Research and Engineering Laboratory initiated a cooperative study which in the long-term generated a significant...

Microcomputer Program for Bridge Analysis & Rating
The microcomputer software system, BRCOM, for the analysis and rating of bridge superstructures is described. The system consists of ten programs written in UCSD P-System FORTRAN, which...

Interactive Analysis and Design Program for Girder Bridges
An interactive microcomputer program for the analysis, design, and rating of girder bridges is presented. The program, GBRIDGE, is user-friendly, menu-driven, and developed in modular...

Optimal Design of Continuous Prestressed Concrete Girders
Design of continuous prestressed concrete girders with possibility of parabolically varying depth in each span is formulated in the form of a mathematical programming problem. The design...

A Microcomputer CAD System for Seismic Design of Regular Highway Bridges
A microcomputer program to implement the recent seismic design guidelines for highway bridges is described. The methodology was developed by the Applied Technology Council (ATC) and is...

Nonlinear Analysis of External Prestressed Bridges
Finite element formulations for analysis of the overall response of concrete bridge girders prestressed with external tendons is described. The analytical procedure includes several nonlinear...

Tiedback Walls Untie Intersection
The intersection of Gallows Rd. and Arlington Blvd. in Virginia's Fairfax County required separation. Tiedback retaining walls, which required only 18 in. instead of the 18-22...

Spanning Urban Obstacles
Extension of Pittsburgh's Crosstown Expressway is a � mile portion of a massive $500 million urban highway now under construction. The extension is a complex of five roadways...

Scenic Squeeze
Constructing a four-lane dual highway through the 12 miles of Colorado's Glenwood Canyon involves several engineering innovations: cantilevered roadways, unusual retaining...

Shoulder Rumble Strips at Narrow Bridges
The highways in the United States have thousands of minimum design narrow bridges. Replacement of these bridges with current state of the art designs is not cost effective nor feasible...

Transitioning End Terminal A TRENDtm for the Future
The highway engineer frequently starts from a position where an identified highway element is causing serious injuries or fatalities to motorists on the nation's highways....

Innovative Solutions to the Challenges of Heavy Civil Projects
Each heavy construction project presents unique conditions and challenges. For large projects, the work scope may justify an extensive engineering analysis and significant investments...

 

 

 

 

Return to search