Microfiltration/Adsorption Technology for Treatment of Industrial Wastewaters: Pilot- and Full-Scale Studies
In this work the development and testing of wastewater treatment system using coagulation, microfiltration and carbon adsorption is described. Studies were conducted first on a bench or...

Radioactive Mixed Waste at the Waste Isolation Pilot Plant
This paper discusses compliance by the U.S. Department of Energy Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico with the Resource Conservation and Recovery Act (RCRA) (1)....

Long-term Land Treatment: A Performance Evaluation
Overland flow (OLF) land treatment has been applied effectively in the United States for the treatment of industrial and municipal wastewaters. Although several overland flow systems in...

Planning for Future Hydroelectric Power: A Myth?
The hydroelectric power industry in the U.S. is authorized and regulated by the Federal Government through the Federal Energy Retgulatory Commission (FERC) under the Federal Power Act....

The Battle Over Burning
Prendergast examined the strategy of integrated solid waste management as a potential solution to the U.S. garbage crisis, in particular the role of resource recovery. This strategy, which...

The Hydro Business: 1990 and Beyond
During the last ten years, hydroelectric generation received more and more attention as a source of reliable and economical electricity. Since the first WATERPOWER conference, the industry...

World Class Manufacturing and Hydro-Electric Production
Operations, maintenance, and administration and support services can benefit from the concepts of World Class Manufacturing. Cellular organizational concepts whether its machines, people,...

Evaluation of Hydro Facilities for Sale to Another Utility
STS Hydropower had been contacted by a major industrial client near one of the STS regional offices for the purpose of evaluating both the technical and financial status of several operating...

Turbine Runner Procurement for the Robert Moses Niagara Power Plant Upgrade
Procurement of the new runners involved the selection of two manufacturers who have entered into a design competition in which competing models will be tested in an independent hydraulic...

University Programs in Computer-Aided Engineering, Design, and Manufacturing
The University Programs in Computer-Aided Engineering, Design, and Manufacturing (UPCAEDM) annual conferences provide for the presentation and exchange of ideas related to current developments...

Contractability?Recent Concepts in Contracting
Owners are customizing project delivery systems by uniquely aligning service agreements and construction contracts. Seeking more productive ways to construct facilities, owners currently...

A Model Cost Comparison Between Construction Management and General Contracting
This paper presents a model cost comparison between general contracting and construction management in a typical mid-rise 5-10 story office building. The model separates cost of construction...

A Construction Lawyer Looks at the Legal Aspects of Constructability
The purpose of this article is to set the legal and contractual frame of reference of constructibility by discussing some of the major factors which give to legal disputes or bad jobs...

Effectiveness of Computers in Construction Execution
Although the effectiveness of computers in construction control during execution has been shown in several case studies, their use is largely made for planning functions. Also, their use...

Opportunities for Innovation in Construction Equipment and Methods
New applications and other significant driving forces indicate a strong opportunity for innovation in construction equipment and methods. Investigations of other industries provide a rich...

EJCDC General Conditions
One of the first and most important of the Engineer's Documents generated was the Standard General Conditions of the Construction Contract. The current version of the General...

Comparison of the EJCDC Documents with the AIA Documents
Both the American Institute of Architects (AIA) and the Engineers Joint Contract Documents Committee (EJCDC) publish a guide to the preparation of Supplementary Conditions which modify...

Packaging Claims
The paper briefly discusses project records and how they may provide important information for claims, what they should contain, and packaging the claim....

Evaluating Alternatives in Construction Management
Construction professionals (i.e., construction owners and contractors) are constantly faced with the task of evaluating alternatives related to managerial issues such as the amount of...

Third Party Interface Within the Construction Contract
The construction contract inevitably requires an interface with a third party, outside of the traditional Owner/Engineer-Contractor relationship. Often, the local jurisdictional body,...

 

 

 

 

Return to search