Validation Studies on Indexed Sequential Modeling for the Colorado River Basin
A method called indexed sequential modeling (ISM) has been developed by the Western Area Power Administration to estimate reliable levels of project dependable power capacity (PDC) and...

Implications of the 1987-1990 Droughts for Hydropower Generation at Reclamation Powerplants
Droughts in the western United States beginning in 1987 have caused water supply shortages and required rationing of water in some areas. The reductions in water supply have also impacted...

An Artificial Intelligence Approach to Multiple Reservoir Operation
The modeling of complex river basins using symbolic computer languages, object-oriented programming and knowledge-based reasoning facilitates, the application of optimization techniques...

Consideration of Sedimentation on Hydropower Projects
Experience gained by analysis of a number of hydropower projects throughout the world leads to the conclusion that it is necessary to consider sediment related aspects in the design and...

Columbia River System Operation Review
For many years hydroelectric power has been a surplus commodity in the Pacific Northwest. However, this picture has been changing rapidly in recent years. Increasing pressures for use...

An Improved Incremental Economic Dispatch Method for Hydroelectric Generators with Nonconvex Energy Production Cost Curves
The Bureau of Reclamation (Reclamation) has undertaken a program to improve water resource management at its hydroelectric powerplants. One feature of the resource optimization program...

Development of the Collett Reservoir Addition to the Muck Valley Hydroelectric Project
The existing 26 MW Muck Valley Hydroelectric Project is located on the Pit River, 90 miles east of Redding in Northastern California. The Project was licensed by the Federal Energy Regulatory...

Case Study: Steele Creek Dam Safety Analysis, Bristol, Tennessee
Steele Creek Dam creates a small recreational park lake before discharging into Beaver Creek a few hundred yards below the dam. Existing homes and trailers downstream from this junction...

Colorado River Probable Maximum Floods
Upper limit design rainstorms (ULDRS) were developed for three locations in the Colorado River drainage above Hoover Dam. For each location, the rainfall magnitudes, spatial and temporal...

Unique Design Used for Collapsible Gate
The collapsible gate on the Wausau Dam is unique; there is only one known that is similar in design. The collapsible gate, which looks like an inverted V, was designed by Mead and Hunt...

Double Radial Gates for the Brunau Ice-Retention Weir in Switzerland
During the springtime thaw, the River Sihl, which flows from the south into the city of Zurich, Switzerland, carries large quantities of ice flow. In 1968, to protect the footings of a...

Diversion of the Parana River for the Yacyreta Hydroelectric Project
The diversion and closure of one of the world's largest rivers, the Parana River on the border of Paraguay and Argentina, for the 2760 MW Yacyreta Hydroelectric Project, sponsored...

Prefabricated Power Plants, Experience and Prospects
This paper presents the prefabrication concept applied to the Greenup (Greenup Locks and Dam, Ohio River, 72 MW, 1982) and the Sydney A. Murray, Jr. (Old River Control Structures, Vidalia,...

Hydraulic Model Studies?Pak Mun Hydroelectric Project (Thailand)
The paper presents briefly the hydraulic problems related to the project which were successfully solved by the 1 to 100 scale hydraulic model study carried out at the Asian Institute of...

Physical Hydraulic Modeling for Construction of New York State Dam Hydroelectric Project
The New York State Dam is located on the Mohawk River near its confluence with the Hudson River. Downstream from the dam, the river flow is divided into four main channels as the water...

Sidney A. Murray, Jr. Hydroelectric Power Plant Turbine Hydraulic Design and Testing
This paper describes the project design concept, highlighting the choice of turbine type and capacity. Model testing and analysis of control by downstream gate is an important feature...

Dardanelle Turbines
The Dardanelle turbines located at river mile 205.5 of the McClellan-Kerr Arkansas River Navigation System, are experiencing an unusual amount of wear in the blade trunnion bushings. Oil...

Hydro Plant Modernization and Uprating
The paper suggests that the method to achieve desirable hydropower benefits at costs lower than for new thermal projects, is through systematic modernization and upgrading of older hydro...

Hydroacoustic Evaluation of Deep and Shallow Spill as a Bypass Mechanism for Downstream Migrating Salmon at Rock Island Dam on the Columbia River
Hydroacoustic data were collected on downstream migrating juvenile salmon (Oncorhynchus spp.) during the springs of 1983 and 1984, and summer 1990 at Rock Island Dam on the Columbia River...

Decision Support for Colorado River Operations
The United States Bureau of Reclamation (Reclamation) uses a simulation model known as the 24-month Study Model for planning monthly and seasonal operations for the Colorado River Basin....

 

 

 

 

Return to search