The Empty Berth: Problems in Developing Countries
The ports in developing countries have grown by leaps and bounds. Different causes (of market, technical, economic, financial or political) were the origin of that irregular growth, derived...

Master Plan for Rehabilitation, Modernization and Expansion of the Port of Suez
Rehabilitation and expansion of the Port of Suez, started in 1977, has been an ongoing process for the last eight years and is continuing. As a result of detailed planning of facility...

Gabon Mineral Port Master Plan?A Case History
The integrated design of infra-structure and superstructure of marine terminals for bulk cargoes presents opportunities for innovative solutions that can produce substantial economic benefits....

Port Master Plans and Feasibility Studies
Port projects are cost-intensive long-life irreversible assets, and developing countries particularly limping with resource constraints could not afford the luxury of short-sighted defective...

Installation of the Port of Singapore's SPM System
To achieve an increase in refining capacity from 70,000 barrels per day to 170,000 barrels per day, a local oil refining company entered into an agreement with the Port of Singapore Authority...

Prestressed Concrete Piling?Design vs. As-Built
The proper design, manufacture, handling and installation of prestressed concrete piles is essential to their structural integrity and long life. A quality control program must be designed...

Port Design and Ship Characteristics
The close relationship between ship characteristics and terminal design is recognized and should be considered as integral part of the total transporation. Ship characteristics to be considered...

Container Crane Transfer Methods
Four schemes are presented for transferring container cranes around a corner: 1) transfer of crane on curved rail, 2) recessed short-radius shuttle, 3) recessed turntable and, 4) at-grade...

Geotechnical Aspects of Waterfront Parks: Case Histories
This paper presents several case histories of waterfront developments, and describes the general approach that the geotechnical consultant should take in the design of these projects....

Local Government Infrastructure Management
The collection of papers presents real world experiences and practical suggestions for improving infrastructure management in local governments. A case study is presented on how a computer-based...

Lifeline Seismic Risk Analysis?Case Studies
These papers employ design concepts and procedures in lifeline seismic risk analysis. Two of the papers describe the seismic hazards in the northwestern United States. A systems model...

Asphalt Pavement Modifiers
Modifiers or additives to asphalt concrete pavements are being researched or marketed by many major chemical firms. Modifiers or additives are used to stiffen the asphalt in hot weather...

How Do Technologists Fit In?
The ASCE Board of Direction is debating whether to admit to associate membership (lowest voting grade) four-year technology graduates on the same basis as BSCE graduates. Today, the latter...

Terzaghi Lectures
1974-1982
Sponsored by the Executive Committee of the Geotechnical Engineering Division of ASCE. This Geotechnical Special Publication contains eight lectures...

In Situ Testing for Ground Modification Techniques
Presented are the status of three in situ testing techniques in relation to Ground Modification and a general overview of eight Ground Modification methods with case histories and appropriate...

Landslide Investigations Using the Weight Penetrometer
The weight penetrometer is a light weight device and can be easily deployed on slopes not accessible to conventional exploratory tools such as drill rigs or cone penetrometers. The weight...

Designing for Maintainability
Inspection and maintenance guidelines are unavailable for many buildings. Building owners seldom have the benefit of such information because buildings are often considered passive systems,...

Comprehensive Odor Control Programat East Bay Municipal Utility District (SD-1)
An odor control study was performed in a wastewater treatment plant in California to evaluate the interactive role of various factors tailored to site specific conditions. The scope of...

Contaminated Well Field Study Case History: West Milford Township
The contaminated well field program initiated by the NJDEP has proven effective in enabling a rapid response to a wide variety of water supply and groundwater contamination problems as...

Comparison of Two Audits for Electric Utilities
Two case studies on environmental audits were examined to illustrate the differences between the comprehensive audit and a focused audit. The differences in audit team composition, technical...

 

 

 

 