Installation of the Port of Singapore's SPM System
by Philip N. F. Wah, Port of Singapore Authority, Singapore,A. S. Rajendra, Port of Singapore Authority, Singapore,
R. Radhakrishnan, Port of Singapore Authority, Singapore,
A. C. Toh, Port of Singapore Authority, Singapore,
Document Type: Proceeding Paper
Part of: Ports '86
Abstract:
To achieve an increase in refining capacity from 70,000 barrels per day to 170,000 barrels per day, a local oil refining company entered into an agreement with the Port of Singapore Authority (PSA) to study the feasibility of installing a Single Point Mooring (SPM) Terminal to off-load crude oil from VLCCs to the refinery. This paper describes the feasibility studies, design and installation of an SPM System which was installed in November 1980 within a period of 18 months.
Subject Headings: Petroleum refining | Feasibility studies | Ports and harbors | Mooring | Petroleum | Non-renewable energy | Terminal facilities | Singapore | Asia