Evaluating Financial Performance of Public and Private Firms Involved in Hydropower Development
The extended abstract compares companies that have gone public and the authors' own company which is private. Included are five publicly, or formerly publicly traded companies...

Capital Cost Modelling for Micro-Hydro Appraisal
Empirical capital cost models for mini- and micro-hydro installations have not been validated with consistent site information. This paper reviews cost modelling techniques and describes...

New Martinsville Hydroelectric Project
The New Martinsville Hydroelectric Project consists of a dual bulb unit, 34 MW powerhouse constructed at an existing lock and dam navigation facility. The project was completed on budget...

Jim Falls Hydro Redevelopment Project Construction
The Jim Falls Hydro Redevelopment Project consists of two 28.5 MW vertical Kaplan units in an enclosed powerhouse with an adjacent spillway. The spillway contains three radial gates, each...

The Construction of the Sidney A. Murray, Jr. Hydroelectric Power Plant
The project, consisting of eight 8.2m bulb turbines rated at 192MW, is located in the State of Louisiana and will use a portion of the water diverted from the Mississippi River to the...

Feasibility, Licensing and Design: Bradley Lake Hydroelectric Project
This paper describes the licensing, environmental, engineering, and design aspects of the project. Due to the project's remote location and geological setting, the paper will...

Retrofitting of Hydro Electric Generators with Bus Fed Solid State Excitation Systems
The Northern Hydro Division has completed retrofitting the excitation systems on 22 generating units ranging in output from 1 to 95 MWatts. The Big Creek Hydro Project upgraded these systems...

Electrical and Mechanical Design, Commissioning, and Performance of the Moose River Hydroelectric Project
The Moose River Hydroelectric Project is a single-unit run-of-river hydroelectric facility located near Lyonsdale, New York, and was developed by a private firm. The generating equipment...

Replacement of Computer Control at John Day Powerhouse
One of the first projects chosen by the Corps of Engineers for computer control was the John Day Project on the Columbia River. John Day powerhouse was completed in 1971 and has 16 generators...

Devil Canyon Powerplant Enlargement Project: Electrical Design Problems and Challenges
Devil Canyon Powerplant is a hydroelectric plant facility of the huge California Water Project. This powerplant is located 5 miles north of San Bernandino. It is currently being enlarged...

Oil Hydraulic Design for Turbine Control
The paper addresses three areas of Oil Hydraulic Design for Francis and Kaplan Turbines: smart accumulator condition sensors, high flow servo logic, and high pressures Wicket Gate cylinder...

Turbine Runner Procurement for the Robert Moses Niagara Power Plant Upgrade
Procurement of the new runners involved the selection of two manufacturers who have entered into a design competition in which competing models will be tested in an independent hydraulic...

Yacyreta Hydroelectric Project Turbine Design
This paper provides general information about this major hydroelectric project on the Parana River on the border between Argentina and Paraguay in South America. In addition, some specific...

Computer Aided Design of Small Hydro Turbine?Phase II
Ateliers Bouvier have been expanding the use of its computer aided design (CAD) system during these last four years, and the aim of this paper is to present some additional aspects of...

Design and Installation Concepts for High Capacity Pump/Turbines
This paper discusses the pre-planned field welding and machining operations utilized for six (6) large pump/turbines, each capable of 508 MW at Virginia Power Company's Bath...

65 MW Bulb Turbine Generating Unit for Tadami Project
The Tadami Hydro-electric Power Project (Tadami Project) of the Electric Power Development Co., Ltd. (EPDC) - Japan is now under construction and is scheduled to be in commercial operation...

Acoustic Flowmeter/Efficiency System Installation at the Niagara Power Project
The New York Power Authority's Robert Moses Niagara Power Project (RMNPP) recently installed an acoustic flowmeter/efficiency system on two 150 MW rated generators. This paper...

Model Tests for Six-Jet Vertical Pelton Turbines for Bradley Lake Hydroelectric Project
A model of a six-jet vertical Pelton turbine, including the spiral distributor, 50 feet of penstock, discharge chamber, and short free-surface tailrace was designed, built, and tested...

Planning and Operation of Hydropower Development on a Navigation System, a Case Study
This paper examines the steps taken to optimally develop the hydropower plant at Lock and Dam No. 13 on the Arkansas River as part of an existing multiple use system. The specific items...

The High Line Canal Hydroelectric Project: Micro Hydro for a Macro Utility
The High Line Canal Hydroelectric Project is rated at 530 kilowatts (kW), and features benefits that accrue due to relatively low costs of $2,100 per installed kW, average annual energy...

 

 

 

 

Return to search