The R.E. in Private Sector Construction
The author relates a private sector construction experience and gives a list of the lessons learned within the project duration, that is, prior to construction start and after construction...

Navy Construction Contract Administration
A U. S. Navy Civil Engineer Corps Officer portrays the varied responsibilities of a Resident Engineer administering construction contracts for the military service. The challenges, rewards...

The Corps Resident Engineer
The paper briefly defines the authority, duties and responsibilities of a resident engineer (RE) in the U. S. Army Corps of Engineers. Based on these, it is concluded that the RE has the...

The Construction Engineer, Bureau of Reclamation
The Construction Engineer's responsibility for the Bureau of Reclamation covers, staffing, contract administration, design data collection, funding, claims, and supervision...

The Resident Engineer's Role in Multiple Contracts
This paper addresses the role of the Resident Engineer who functions either as a General, Electrical, Mechanical or Mechanization Engineer in multiple prime construction contracts. By...

The Resident Engineer as a Communicator
Communication is an important part of the Resident Engineer's job of Contract Administration. This article focuses on the problems facing the Resident Engineer in communicating...

Development of a Resident Engineer
The author discusses a development program suitable for a Resident Engineer to take up. Included in the requirements of the program are actual experiences, training courses and personal...

Blind Drilling Down Under
Australia's largest blind drilled shaft is a 14 ft diameter fresh air shaft for the Agnew nickel mine 500 miles northeast of Perth. It was drilled in one pass using air-assisted...

Cost Engineering for Disputed Work
Engineers and architects tend to underestimate the cost of disputed work, especially those connected with delay. The engineer, using industry standards and estimating rules of thumb, can...

Resource Allocation with Project Manager Control
There are some logical reasons behind the partial acceptance of the resource allocation research by the construction industry. These reasons are based on field experience and the daily...

Simulating Construction Operations by Microcomputer
Field operations on major construction projects involve complex interactions among construction equipment, materials and supplies, skilled craft resources, and technical and administrative...

Modeling Construction Companies
This paper reports on the development, implementation, and practical use of a micro-computer based system which simulates the organizational performance of construction companies. The...

Decision Support System for Tunneling
This paper first discusses methodologies for considering geological uncertainty in tunneling projects and for determining the most economic excavation and support methods under such condition;...

Soft Ground Tunneling of the Greenbelt Tunnels
Mergentime/Loram's contract for the construction of Section E-1d Greenbelt Route Tunnels includes construction of dual 1,770-foot tunnels in soft ground, a crossover structure,...

Construction of Mt. Baker Ridge Tunnel
Mt. Baker Ridge Tunnel is a large diameter soft ground highway tunnel constructed through sensitive over-consolidated silts and clays. Its large diameter necessitates the construction...

Avoiding Disputes Through Better Management Techniques: A Contractor's Viewpoint
Utilizing management techniques to avoid disputes is an important function which allows resources to be focused on the project objectives. Relationships are enhanced, cost are reduced,...

Avoiding Contractor Disputes During Project Design
The New Jersey Transit Corporation is in the second phase of a billion dollar rebuilding program of its rail system. The first phase, which featured electrification and signal system replacement,...

Avoiding Disputes: The Construction Manager's View
Avoiding and minimizing contract disputes, from the construction manager's (CM) point of view, begins during the preliminary planning and design stages and continues throughout...

Proper Specifying with the Or Equal Clause
'Or Equal' product specifications are the subject of this paper and shown to be frequently involved in quite serious contract disputes. Management strategies...

Constructibility Review of Documents Before Bidding
Many claims have their inception at the very beginning of a project, specifically at the time of bidding. Contractors review the Contract Documents prior to bidding. The way in which they...

 

 

 

 