Paleoflood Hydrology and Design Decision for High-Risk Projects
Paleoflood hydrology is not merely one of several alternative methods for risk-based design. Rather, certain kinds of accurate data on the largest paleofloods of recent millennia provide...
Municipal Stormwater Management Ordinance Development and Implementation in Pennsylvania
This paper discusses the critical planning and engineering components of a sound stormwater management ordinance and how they can be shaped to avoid commonly encountered basin-wide implementation...
Urban Stormwater Management Practices: Concepts and Misconceptions
A variety of methods are practiced for the management of urban stormwater runoff. These include detention basins/ponds, retention basins, infiltration basins, and seepage pits. This paper...
An Expert Advisor for Selective Withdrawal Operations
A rule-based computational advisor that aids in the selection of selective withdrawal operations for project release temperature maintenance is discussed. This advisor couples a one-dimensional...
Development of a Computer Aided Decision Process for Channel Rehabilitation and Watershed Enhancement Techniques
To assist the engineer in planning and design of channel stabilization measures, an expert system (CADWET) was developed using a commercially available expert system shell program. The...
The Study and Practice of the River Regime Planning and Sediment Management in Gezhouba Project of the Yangtze
Based on the Practice of Gezhouba Project, the first water control project on the mainstem of the Yangtze and the largest hydroproject in China, this paper lays emphasis on importance...
Shell Island Restoration
Shell Island is a barrier island along the Louisiana coast that protects back bays and marsh land south of New Orleans. In 1979, the island was breached by a hurricane, exposing the back...
Geomorphic and Sedimentologic Evaluation of a Proposed Flood Control Project, Truckee River, Reno, Nevada
Geomorphic observations, sediment data and shear stress analyses were integrated to evaluate the potential responses of the steep, coarse grained Truckee River to a proposed flood control...
Evaluation of Streambank Erosion Control Demonstration Projects
The Streambank Erosion Control Evaluation and Demonstration (SECED) Act of 1974 (Section 32 of Public Law 93-251) was enacted by Congress to obtain information on costs and performance...
Streamflow Forecasting: Experiences in Development of Customized Systems for Hydropower Operations
Technical advances in computers and real time data acquisition favor the development of computer based streamflow forecasting systems. These technical advances should be combined with...
Corps of Engineers Sediment Management Program
The existing sediment management program includes sediment investigations of reservoir, river and levee projects; gathering and maintaining sediment load records; providing sediment investigation...
Major Sedimentation Issues for the USGS
Historically, sediment information has been used primarily in planning for engineering structures that were designed to meet a single or a very limited number of objectives. Today most...
Ring Gate as Turbine Emergency Shut-Down Device
The ring gate, intially used as a regulating device in the early stage of the design of hydraulic turbines, has grown to a reliable emergency shut-down device. Incorporated in the hydraulic...
Storm Water Management and Wetland Restoration?Ballona Channel Wetlands
A storm water management plan was engineered to provide storm water dention necessary for site develop and at the same time to allow wetland restoration. Objectives of the project were:...
Modelling of Stages of Nile River as a Tool for a Better Water Resources Management
As far as Egypt is concerned, the Nile is not just a river, it is rather the pulsing nerve of life. Consequently, it was essential to maintain detailed information about its levels and...
Overview of Mathematical Models?River Nile/High Aswan Dam
This paper has been directed towards the presentation of seven reliable planning tools (mathematical models) that can be used for the investigation of the planning options facing policy...
Sacramento's Proactive Stormwater Permit Program
In January 1990, with the encouragement and assistance of the California Regional Water Quality Control Board-Central Valley Region (Regional Board), the City and County of Sacramento,...
Utilization of Stormwater Runoff to Recharge Underlying Aquifer
The expanding economy in Oman has led to rapid development in the Capital area. Water is critical to sustaining this rapid growth, and new sources of water are being sought to meet the...
Basin-Wide Stormwater Management in Pennsylvania?A Case Study of Hydrologic Performance Standards
Performance standards in the form of 'release rates' are developed using hydrologic computer models. This basin-wide approach to stormwater management considers...
Decoverly Lake?Functional Hydraulics & Aesthetics
The Decoverly Office Park is located in Rockville, MD. In 1984, engineering design on the seven office building park and pond was begun by the consulting engineers. From the beginning,...
Return to search