Utilizing Wetlands for Stormwater Retention
The design steps an engineer uses to develop natural wetlands to provide flood control while continuing to retain their natural functions will be analyzed. This paper will include a discussion...
Assessment of Changes at Glen Canyon Dam
This paper describes the complexity associated with the assessment of financial impacts of proposed and actual short-term restrictions at Glen Canyon Dam. The reasons for these restrictions...
Evaluating Hydro Project Benefits with the POWRSYM Production Cost Model
The contribution that a hydro peaking project or pumped-storage project makes to reducing system operating costs can be determined only by modeling the project's operation...
Consideration of Sedimentation on Hydropower Projects
Experience gained by analysis of a number of hydropower projects throughout the world leads to the conclusion that it is necessary to consider sediment related aspects in the design and...
Development of the Collett Reservoir Addition to the Muck Valley Hydroelectric Project
The existing 26 MW Muck Valley Hydroelectric Project is located on the Pit River, 90 miles east of Redding in Northastern California. The Project was licensed by the Federal Energy Regulatory...
Engineering Risk Assessment for Hydro Facilities
Faced with escalating property insurance premiums, the Alaska Energy Authority decided to evaluate what losses may realistically be expected due to catastrophic events at their hydroelectric...
Risk Analysis Applications for Dam Safety
Dam safety modifications are intended either to reduce the likelihood of the adverse consequences of dam failure or the magnitude of adverse consequences. For instance, widening a spillway...
Examples of Risk Assessment in Dam Safety Decision Making
Three examples of risk-based dam safety evaluations performed for dam users or operators are summarized. These studies were conducted by major U.S. engineering firms and involved experienced...
New Techniques and Data Sources for PMP
Testing has been conducted on new methods and storm data sources for the past two years with the purpose of providing more tools to dam owners for the assessment of probable maximum precipitation...
Dam Stabilization/Modification at Lighthouse Hill and Schuylerville Hydropower Developments
Remedial measures including posttensioning of concrete structures, earth dike armoring, tainter gate modification and replacement of deteriorated concrete to meet federal and state hydraulic...
Bishop Intake #2 Spillway Modifications: A Case History
This paper covers the history of the events leading to the modification of Southern California Edison's (SCE) Bishop Intake 2 to pass a site specific design flood. From the...
Emergency Action Plans: A Need for Comprehensive Exercises
The Federal Energy Regulatory Commission's (FERC) Guidelines for Preparation of Emergency Action Plans (EAP) require that licenses conduct periodic in-depth testing, or comprehensive...
Brule Hydroelectric Project Inflow Design Flood Study
In 1987, Wisconsin Electric Power Company (WE) was directed by FERC to provide additional spillway capacity at it's 63-foot (19 m) high Brule Dam. Original spillway capacity...
Double Radial Gates for the Brunau Ice-Retention Weir in Switzerland
During the springtime thaw, the River Sihl, which flows from the south into the city of Zurich, Switzerland, carries large quantities of ice flow. In 1968, to protect the footings of a...
Diversion of the Parana River for the Yacyreta Hydroelectric Project
The diversion and closure of one of the world's largest rivers, the Parana River on the border of Paraguay and Argentina, for the 2760 MW Yacyreta Hydroelectric Project, sponsored...
Prefabricated Power Plants, Experience and Prospects
This paper presents the prefabrication concept applied to the Greenup (Greenup Locks and Dam, Ohio River, 72 MW, 1982) and the Sydney A. Murray, Jr. (Old River Control Structures, Vidalia,...
Rocky Mountain Project?Overview
The Rocky Mountain Project, in Northwest Georgia, will be a three unit hydroelectric pumped-storage project with 850,000 kW installed in an above ground powerhouse. The gross water volumes...
Hydraulic Model Studies?Pak Mun Hydroelectric Project (Thailand)
The paper presents briefly the hydraulic problems related to the project which were successfully solved by the 1 to 100 scale hydraulic model study carried out at the Asian Institute of...
Hydraulic Aspects of West Delaware Tunnel Hydroelectric Development
Construction of a 7,500 kilowatt hydroelectric plant at the end of a 70 kilometer long water supply tunnel posed unusual hydraulic conditions that needed special consideration. Cooperation...
Physical Hydraulic Modeling for Construction of New York State Dam Hydroelectric Project
The New York State Dam is located on the Mohawk River near its confluence with the Hudson River. Downstream from the dam, the river flow is divided into four main channels as the water...
Return to search