Development of an Optimal Strategy for Storm Sewer Infrastructure Rehabilitation
Rehabilitation of the nation's infrastructure will require a significant expenditure of public funds in the near future. Efficient management of these funds will require tools...

Rehabilitation of Water Distribution Systems Planning and Implementation
The paper describes the approach taken to develop infrastructure rehabilitation procedures for Water Distribution Systems. Early research attempted to develop a mains condition oriented...

Inspection Goes High Tech
Many believe that rehabilitation of the existing infrastructure�not net construction�will dominate the 1990s. Therefore, accurate condition assessment is crucial, since public works agencies...

Cables Not in Trouble
Cable-stayed bridges in the U.S. are not, contrary to reports widely disseminated in the press several years ago, about to fail from corrosion. The design, in which primary cables support...

Are We Ready to Face the Geotechnical Challenges of the 21st Century?
The geotechnical engineering profession faces a bright future as many of the issues of interest to society today relate in some form to knowledge of earth sciences. Hazardous waste, environmental...

Geotextile Edge Drain Design and Specification by Expert System
Expert systems can be developed and operated on personal computers to aid in the design of the geotextile filter component of pavement edge drains. The expanding use of geotextiles in...

Environmental Monitoring Systems?A Case Story?The Great Belt
The law passed by the Danish Parliament on the construction of a combined bridge and tunnel across the 18 km wide Great Belt, included an environmental design criteria. This has initiated...

Interim Findings of an Ocean Policy Study for the State of Mississippi
In 1989, the Mississippi-Alabama Sea Grant Legal program received funding from the National Sea Grant Program to produce an Ocean Policy Study for the state of Mississippi. The goals of...

A Concise Discussion on Coastal Island Economy Development
Some basic principles to develop coastal island economy has been proposed in this paper on the basis of analyzing the characteristics of coastal island economy, and these principles can...

Outlet Works Modifications at Abiquiu Dam
For the installation of a hydroelectric project at the Corps of Engineer's Abiquiu Dam in New Mexico, outlet works modifications that would not affect the structural integrity,...

Innovative Reregulation Weirs for Dam Releases
Two different reregulation weir designs for dam release improvement are discussed. A porous timber crib is favored for applications where increased minimum flow is needed, and a labyrinth...

Bridge Scour Vulnerability Assessment
Although the failure of the New York Throughway bridge over Schoharie Creek in 1987 has focused national attention on scour related failures, other failures reinforce the need for implementing...

Local Resources in Developing Country Water Supplies
Maximizing the use of local resources in water supply projects can expand markets for locally produced equipment and materials, reduce exports and minimize expenditures of hard currency...

Using Social Infrastructure in Support of Appropriate Technology
This paper proposes and argues for an expanded definition of social infrastructure, suggesting that the creation, adoption and maintenance of appropriate technology are dependent upon...

Appropriate Technology in Infrastructure Development and Management
Infrastructure management principles apply to appropriate technologies used for hydraulic structures. However, some of the principles are more culturally sensitive than others, mainly...

Liabilities in Temporary Structures Failures?Representative Case Histories
Eight case studies involving construction accidents caused by failure of temporary structures are presented. These studies illustrate the oftentimes unintended consequence of utilizing...

FHWA'S Bridge Temporary Works Research Program
The Federal Highway Administration (FHWA) has developed a research program to address bridge falsework design and construction. This resulted from the collapse of the Route 198 bridge...

Temporary Structures for Protection and Access
Temporary Structures in Construction Projects (TSC) are utilized for three (3) purposes A. Support (of the structure being built or adjacent structures or utilities) B. Protection (of...

Performance of a Prestressed Rigid Frame During Removal of Column 6W from I93 in Boston, Massachusetts
The first phase of the suppression of Boston's Central Artery included the Early Viaduct Construction in the Central Artery North Area. This project required that Column 6W...

Permanent Structure as Part of the Underpinning System for Boston's Central Artery
The Central Artery, a major six lane structural steel viaduct, has been one of Boston's most significant roadways over the past three decades. Increasing congestion, accidents,...

 

 

 

 

Return to search