Application of Computer Aided Design and Analysis Tools for Upgrading Existing Power Plant Equipment
This paper presents examples where state-of-the-art computer aided design and analysis techniques have been applied to upgrade hydraulic performance and structural reliability of existing...
Application of an Integrated Numerical System for the Modernization of Hydro Turbines
The modules of an integrated numerical system for the new design and replacement of hydro power plant components are described and some examples of application are shown. The main modules...
Coordinating Engineering and Environmental Activities in Hydropower Development
This paper reviews the role of hydropower project personnel, particularly the interaction between project management, engineering, and environmental sciences staff in project planning...
Hydropower Contract Conditions for Civil Engineering Works
Norwegian types of contract documents for hydropower construction work - especially the underground parts - have long had the reputation of being flexible as opposed to the traditionally...
Interactive Simulation of Hydropower Systems
This paper describes a new educational technology that has proven extremely effective in introducing both technical and lay persons to the operational principles, management alternatives,...
A New Generation of Standard Francis Spiral Turbines
A new generation of standardized Francis spiral case turbines has been developed by Voith. The high performance has been achieved through employment of the most recent hydraulic designs...
HYPOS?Hourly System Hydropower Scheduling
HYPOS (Hydro Power Scheduling) is a modification of the program HYPO as presented at Waterpower 81. HYPOS is an interactive system which allows schedulers to assign hourly power generation...
Hourly Scheduling Model for Multi-Unit Hydro Facilities
A computer model for determining hourly releases and generation for multi-unit hydropower facilities is described. The purpose of the model is to disaggregate daily release volumes (either...
Modeling a Real-Time Reservoir Operation for Hydropower Resources Analysis
This paper deals with modeling the operation of two reservoirs in tandem in order to determine energy gain at the downstream plant due to the regulation provided by the upstream reservoir....
Water Availability for Energy Development in the Upper Colorado River Basin
The Bureau of Reclamation is investigating, for planning purposes through hydrologic determination, the total allowable depletion level in the Upper Colorado River Basin. The Colorado...
Hydroelectric Project Design Using Microcomputers
The main issue in the first stage of a hydroelectric project is to assess the influence of hydrologic parameters on design and optimum sizing of the installation and on future energy production....
Hydro Systems Evaluation on Personal Computers
The programs for selecting the equipment and determining the average annual energy have been separated from the detailed financial analysis. The BASIC language was selected for the first...
Microcomputers as Productivity Aids for Small-Scale Hydroelectric Projects
Off-the-shelf software that has been used to improve productivity includes Computer-Aided-Design-and-Drafting (CADD) systems, spreadsheets, project managers, word processors, and communications...
Simplified Model for Micro-Hydro Feasibility
A computer model was developed for evaluating the preliminary hydraulic and economic feasibility of potential micro-hydro development sites. Among the main objectives of the model are...
Computer Modeling for a Power Intake
This paper describes the application of an existing computer model to respond to environmental requirements for a small scale hydroelectric power plant being developed by Allegheny Electric...
Simulation of River Ice Processes on Alaska's Susitna River
A numerical river ice model is applied to an 85-mile reach of Alaska's Susitna River immediately downstream of the proposed Susitna Hydroelectric Project. The model is designed...
Computer Modeling and Applications
A series of programs is available to evaluate the hydrology, compute the capacity to generate energy, establish unit costs, analyze penstock surge pressures, and simulate ramping rates....
Design of Drilled Piers Subjected to High Overturning Moments
The results are presented of a research study directed at improving the state-of-practice, and resulting foundation economy, in the design of laterally loaded drilled pier foundations...
A Laboratory Study of Factors Affecting Wetted Snow Roads
A brief review of the the literature concerning the application of water to the surface of snow roads is presented. It is demonstrated that there is no general agreement on the proper...
The CBR Test Applied to Processed and Compacted Snow
The processes used during the past two decades to improve the snow bear a modest resemblance to conventional flexible pavement construction, thus the field CBR (California Bearing Ratio)...
Return to search