Priority Integrated Pipe Evaluation
The selection of the most suitable pipe for a given site involves the consideration of many factors affecting pipe performance. The factors to consider in sewer pipe evaluation and selection...
Soil Parameters for Design of Buried Pipelines
This paper presents the table of recommended design parameters for soil, shows their physical significance, and compares the resulting stiffness and strength for the variety of soil and...
New Installation Designs for Buried Concrete Pipe
The rational development of new installation designs for buried concrete pipe is described. Over 100 analyses were performed using a new computer program named SPIDA (Soil Pipe Interaction...
A Multilayered Model for Analysis of Composite Pipes
A multilayered model is developed to analyze the behavior of composite pipes, such as prestressed concrete pipe, to the combined effects of internal pressure and applied loads. The pipe...
Successful Rehabilitation of Sewers at Hawaii Kai
Two common problems in sanitary sewer deterioration are hydrogen sulfide attack to concrete pipe and structures and infiltration leakage into the system. Within the 100 miles (160 km)...
Bartolo Water Pipeline Rehabilitation Study
Restoration of old, large-diameter pipelines in highly urban settings presents challenges in cost effectively preparing the structures for reliable service under modern operating conditions....
Inspection of Under Bridge Length Culverts
Culverts over 20 feet in span length are classified as bridges and are inspected under the National Bridge Inventory and Inspection Program. Those facilities under bridge length, less...
The Use of Restrained Joint Ductile Iron Pipe
This paper addresses some of the problems we at U. S. Pipe have observed from restrained joint installations during the past several years and the solutions devised. The restrained joints...
Thrust Restraint of Buried Ductile Iron Pipe
It is the intent of this paper to present current state of the art thrust restraint design, present a basis for calculating required lengths of restraint, and to offer some practical suggestions...
The Applicability of U.K. Sewerage Rehabilitation Techniques to the U.S.
The total length of public sewers in the UK is 160, 000 miles and in recent years there has been increasing concern over their conditions. Research spearheaded by the Water Research Centre...
Water Main Condition Monitoring A Case Study
Water main breaks, routine occurrences for water utilities, reflect the structural failure of the main. The trend in break patterns is increasing for many utilities in the U. S. Several...
Pipe Geometry and Pipeline Bridge Wind Oscillation
Static and modal analyses of two pipeline suspension bridges owned by American Natural Resources - the Patterson Loop Aerial Crossing (PLAC) with a span of 850 feet (259 meters) and the...
An Investigation of the Supports of a Water Main
Two 48 inch (1. 22 m) diameter cast iron pipes constructed 50 to 70 years ago form a major part of the potable water transmission system of Atlantic City. For the most part of their length,...
Monitoring of a Gas Main During Construction
This paper focuses on the task of formulating and implementing a viable plan for protecting an existing gas main located in a construction site where construction activities include excavation,...
Underground Storage Tank Program and Its Implications
National concern over leaking underground tanks storing hazardous materials and wastes has resulted in the implementation of the 1984 Amendments of RCRA, which include the requirement...
Buried Pipeline Research Needs
A workshop was convened with representatives from universities, consulting engineering and research organizations, pipe and/or equipment manufacturers, constructors, users, and government...
Effects of Ground Failure on Ductile Iron Pipe
The design studies and procedures outlined in this paper for pipelines that must cross earthquake fault zones are also applicable to similar ground disturbances resulting from landslides,...
Design/Construct Contract Speeds Bridge Job
In the name of time and money savings, Pennsylvania DOT is building a bridge using a modified turnkey contract. In contrast, the standard approach is first to design the bridge, then ask...
Rehabbing the Underground Railroad
The Park Ave. Railroad Tunnel brings three commuter rail lines into New York City's Grand Central Station. The four tracks occupy three tubes from 97th St. to 57th St., where...
Japan Tunnels under the Ocean
The 54 km Seikan Tunnel, the longest undersea railroad in the world, opened in March. The tunnel, which connects Japan's two largest islands, Hakkaido and Honshu, is part...
Return to search