Harnessing the Snake: A Construction Viewpoint
The Gem State Hydroelectric Project, five miles south of Idaho Falls, Idaho on the Snake River, consists of a 900-foot-long, 40-foot-high dam; approximately four miles of earthend dikes;...

Pumping System Permits Diversion of Water River Dam
For project construction at an existing Corps of Engineers' dam in New Mexico, where modifications to the existing outlet works were performed, a barge-mounted pumping system...

Buffalo Bill Dam Modifications?Modification of an Existing Bureau of Reclamation Facility to Increase Power Generation
This paper describes a joint venture between the United States Bureau of Reclamation and the State of Wyoming to increase the storage capacity and power generation capacity of Buffalo...

Modeling Sedimentation Problems at Hydro Developments
Sedimentation embodies the processes of erosion, transportation and deposition of sediments. At hydro developments, sedimentation can create problems. Computer sedimentation models (CSM's)...

Analysis of Unsteady Flows in Irrigation Canals Due to Load Rejection in Hydroelectric Project
An add-on hydroelectric project has been proposed for the Owyhee Tunnel No. 1, a component of the Owyhee Irrigation Project constructed in the 1930's by the U.S. Bureau of...

Implementation of a General Purpose Site Monitoring Network
STS Hydropower owns and operates several hydroelectric plants distributed throughout the United States. These plants, equipped with intelligent controllers, have been remotely monitored...

Fluctuating Pressure Measurements on a Large Hydro Turbine
The New York Power Authority is investigating the feasibility of upgrading the thirteen 150,000 kW turbines-generators at the Robert Moses Niagara Power Station to improve efficiency and...

Digital Data Acquisition and Performance Testing of Hydroelectric Equipment
The U.S. Army Corps of Engineers Hydroelectric Design Center has elected to use digital data acquisition methods when conducting performance tests of hydroelectric units. Transducers have...

Renewal of the Burt Dam Generating Station
The present redeveloped hydro facility operates as a 300 kW run-of-river station automated by a head pond level controller which adjusts turbine setting to match available river discharge....

Turbine Conceptions for Low Heads and Their Application in US Hydro Power Stations
To improve the feasibility of small power plants standardized units were developed. The bulb turbine technology as well as the pit-type conception improve the feasibility of larger plants....

Quick Response on the Mississippi
In November 1987, the Mississippi River broke through the foundation of the St. Anthony Fall's Lower Dam Hydropower Plant. The plant's owner, the Northern State...

Sediment Transport Modeling
This is the Proceedings of the International Symposium on Sediment Transport Modeling, held in New Orleans, Louisiana, August, 1989. It reviews the state of the art and presents the latest...

Automated People Movers II
New Links for Land Use?Automated People Mover Opportunities for Major Activity Centers
This Proceedings, which consists of 94 papers presented at the Second International Conference on Automated People Movers (APM's) held in Miami, Florida on March 13-15, 1989,...

Post-Audits of Environmental Programs and Projects
This is the proceedings of a session at the ASCE Convention, New Orleans, October 1989. Post-audits include evaluation, assessment, and audit of the effects, both intended and unintended,...

Metro Project Implementation?The Early Stages
Metro (the Municipality of Metropolitan Seattle) is a federation of governments in King County, Washington which is responsible for regional public transportation and waste water collection...

Getting the Most From Engineering Consultant
The Los Angeles County Transportation Commission ('LACTC') has embarked upon a 150 mile rail transit construction program within Los Angeles County. A program...

Selection of Consultants for Municipal Water/Wastewater Projects
The City of Dallas, Texas Water Utilities Department is responsible for the design and construction of all needed water and wastewater facilities including treatment plants, pump stations,...

Maintenance on Underground Subway Construction
The paper discusses maintenance the three types of subway construction in the Bag Area Rapid Transit system: cut and cover, driven tunnel, and prefabricated subaqueous railroad tube. Specialized...

Reflections on Design of a Turnkey Hydro-Power Project?Calaveras, California
Developing the Calaveras project under a turnkey agreement has shown that: (1) some 2 years can be saved, (2) cash flow for the owner is significantly delayed, because engineering is first...

U.S. Army Corps Engineers Construction Contract Claims Guidance System
Researchers at the U.S. Army Construction Engineering Research Laboratory (USA-CERL) have been developing an expert system called Claims Guidance System (CGS) to provide claims analysis...

 

 

 

 