Analysis and Stabilization of Ambursen Dams?Two Case Studies
Case studies are presented about the analysis and rehabilitation of two slab-and-buttress (Ambursen) dams. The paper discusses the investigation techniques used, including sampling of...

Rehabilitation of the Dams at the Crescent and Vischer Ferry Hydroelectric Projects
This paper reviews the dam rehabilitation design and construction techniques used at the New York Power Authority's Crescent and Vischer Ferry Dams. The following are the...

Outlet Works Modifications at Abiquiu Dam
For the installation of a hydroelectric project at the Corps of Engineer's Abiquiu Dam in New Mexico, outlet works modifications that would not affect the structural integrity,...

Unique Design Used for Collapsible Gate
The collapsible gate on the Wausau Dam is unique; there is only one known that is similar in design. The collapsible gate, which looks like an inverted V, was designed by Mead and Hunt...

Raising of King Talal Dam
The King Talal Project is located on the Zarqa River, a Jordan River tributary, in Jordan. An existing embankment dam, 100 m high, built in the mid-seventies by the Jordan Valley Authority...

Three Dimensional Modeling of Concrete Dams with Cracks Using Boundary Element Methods
Determining uplift pressure distributions in cracks in a concrete dam requires coupling between crack hydraulics and the stresses and displacements occurring in the rock and the concrete...

Rocky Mountain Project Conceptual Design of Upper Reservoir
The 9300 acre-foot upper reservoir for the Rocky Mountain Project will be formed by an 80-ft high ring dam with a crest length of 12,800 feet. Sandstone and shale of the Pottsville formation...

Prefabricated Power Plants, Experience and Prospects
This paper presents the prefabrication concept applied to the Greenup (Greenup Locks and Dam, Ohio River, 72 MW, 1982) and the Sydney A. Murray, Jr. (Old River Control Structures, Vidalia,...

Physical Hydraulic Modeling for Construction of New York State Dam Hydroelectric Project
The New York State Dam is located on the Mohawk River near its confluence with the Hudson River. Downstream from the dam, the river flow is divided into four main channels as the water...

Through-Flow Analysis for Rockfill Dam Stability Evaluations
Existing rockfill dams may have spillways that are not adequate to pass the current probable maximum flood (PMF), having been designed prior to the publication of the latest Hydrometeorological...

Modernization of the Schoolfield Dam Hydroelectric Powerhouse
This case study describes the retrofitting of a turn-of-the-century powerhouse with modern turbine/generator equipment. The structure consists of numerous turbine bays separated by massive...

Rehabilitation of Dams, Spillways, and Hydroplants
Many older dams are in need of rehabilitation as a result of aging, deterioration, and more stringent safety standards. Concerns include deterioration of original construction materials,...

Operations and Maintenance Manual for Bradley Lake Hydroelectric Project
Bradley Lake Hydroelectric Project is located on the Kenai Peninsula of Alaska. The project consists of two 63 MVA turbine-generators fed via a single 3.5-mile-long penstock. The water...

Evaluation and Rehabilitation of Clogged Drains at Concrete Gravity Dams
Studies have shown that properly spaced drains of adequate depth provide the principal means of relief from uplift pressures beneath concrete gravity dams. Drains often become encrusted...

The Unusual History of a Flowline Canal Within a Reservoir
This paper discusses the history of and remedial repairs to a flowline canal which carries water from the headwater of Lake Isabella in California to Southern California Edison Company's...

Ashton Hydroelectric Project Rehabilitation
This paper presents the project experience of rehabilitating the 70-year old Ashton power house and performing the dam design modifications to pass the increased probable maximum flood....

Development of an Eicher Screen at the Elwha Dam Hydroelectric Project
The Eicher Screen is a relatively new concept for screening juvenile fish out of hydroelectric turbine penstocks. The concept was developed by Mr. George Eicher and one was recently installed...

Hydroacoustic Evaluation of Deep and Shallow Spill as a Bypass Mechanism for Downstream Migrating Salmon at Rock Island Dam on the Columbia River
Hydroacoustic data were collected on downstream migrating juvenile salmon (Oncorhynchus spp.) during the springs of 1983 and 1984, and summer 1990 at Rock Island Dam on the Columbia River...

Numerical Methods for Simulating Debris Blockage Failures and Mudflows
This paper presents the procedures and results from an investigation to evaluate the hydraulic characteristics of mudflow events resulting from hypothetical failures of a debris blockage...

Thermal Regimes at Tailwaters of Hydroelectric Dam
Continuous temperature data were collected in the field for periods of approximately two weeks in Center Hill Tailwater. These data were analyzed to determine the warming rates and travel...

 

 

 

 

Return to search