Construction Inspection?The Last Line of Defense
Construction inspection, or a quality assurance program, is typically the last line of defense in relation to claims for the constructed project. The quality assurance team should be a...
Inspection Costs Versus the Benefits Derived
The following text describes the experiences of a small suburban municipality located in Middle Tennessee before, during and after a five-year program of comprehensive inspection and testing...
Documentation?A Key to Preventing Contract Disputes
From most attorneys' point of view, when the elements of good contract administration are studied and discussed, one of the most important elements is thorough and accurate...
A Systematic Approach to Evaluating the Risk of Contractual Disputes
Construction contract disputes along with A/E malpractice actions have raised much concern in the industry. Considerable literature has been written along the lines of claims avoidance...
An Owner's Role in Dispute Avoidance & Resolution
Construction disputes can be avoided in number and severity through education of the project team. This paper will identify a variety of ways an owner can avoid disputes, pinpointing reasons....
The American Association of Cost Engineers Claims Project
Construction contract disputes, or dressed in their popular nomenclature, 'contract claims', have become an established aspect of the non-residential construction...
Revitalization of Existing Buildings: An Owner's Perspective
Revitalization of the large stock of existing buildings in this country is of paramount importance today to building owners, who want the value of existing properties to appreciate as...
Changing Priorities in UK Construction Research
This paper addresses two types of situations to contend with in building assessment: aging structures all built at about the same time and to standards no longer acceptable, and newer...
Masonry Rehabilitation: Practice and Research
The rehabilitation of masonry buildings is a major construction activity in the United States. The available techniques and evaluation methodologies are limited to visual investigation...
Effect of Voids on Creep Rate and Strength
The classic macroscopic Kachanov-Rabotnov model of material damage due to voids is reviewed. Detailed analyses of bulk mechanical properties of dilutely voided materials with certain,...
Centrifuge Model Testing with Dynamic and Cyclic Loads
This paper examines the use of small-scale tests on centrifuges to study a wide range of problems in soil dynamics - including machine foundations, structures and explosion effects. The...
Uplift Behavior of Shallow Soil Anchors?An Overview
An overview is presented of the static uplift (tensile) behavior of shallow anchors used for foundations in soil. Basic anchor types are described, and their general installation and behavioral...
Uplift Capacity of Shallow Offshore Foundations
Soil failure under upward loading is investigated by experimental laboratory tests. The problem of uplift capacity is considered in terms of effective stresses in soil skeleton and pore...
Transmission Tower Foundations in Weathered Rock
A case history is presented which discusses the siting, design and construction of the tower foundations for a transmission line in southwest Alaska. The project, completed in 1983, consists...
Construction Cost Control
The second edition of
Composite and Mixed Construction
Steel and reinforced concrete are frequently combined in composite or mixed structural systems. This combination generally results isn greater economy and safety than could be achieved...
Specifications for the Design and Construction of Composite Slabs and Commentary on Specifications for the Design and Construction of Composite Slabs
Composite slab construction is defined as a system comprising normal weight or lightweight structural concrete placed permanently over cold-formed steel decking in which the steel deck...
Making Computerized Project Control Systems Work?Background
Control systems can be considered as consisting of five major elements. These are: establish the objective or standard to be achieved-quality, maximum duration, resource utilization, maximum...
Construction Contractor Cost Control
Cost control for a contractor engaged in a fixed-price construction contract encompasses all actions directed toward the controlling or influencing the cost outcome of the project. When...
Project Management Software: What Is in the Future?
This paper predicts the future of project management software and provides a discussion of the assumptions made to develop these predictions. It provides a flexible framework for future...