Cedar Falls Project?Major Rehabilitation
This paper presents planning objectives and operational considerations which governed the design and construction of a major rehabilitation project implemented at the City of Seattle's...

Green Mountain Power Corporation Bolton Falls Hydroelectric Project
The project proceeded through preliminary design, FERC licensing, and into detailed design, following its selection as one of seven low-head redevelopment projects to be partially funded...

Murray Hydro Project?Structural Design
This paper will summarize design criteria, parameters, methods of analysis, and other relevant data that were used in the design process of the structural features of the Murray powerhouse...

Single Conduit Dam Design
In today's arena of increasingly higher costs for major dams, planners and designers are continuing to look into ways of reducing the overall costs for the development of...

Civil Design of Underground Hydro Power Projects
Various reasons exist for the development of underground schemes. Limited space at dam sites in deep and narrow river valleys makes it favourable to separate the power house from the dam...

Waterstop Technology?The Next Chapter
Water leakage through and around failed waterstops in concrete structures can cause serious flooding, damage to equipment, affect structural stability, and pose potential safety problems....

The Use of Polyurethane Grouts and Grout Tubes
Most polyurethane grouts used for seepage control are one-component, and water activated. They are prepolymers of a polyisocyanate with a polyol. Some of the polyurethane grouts use an...

OK Menga Hydroelectric Project, Papua New Guinea
The Ok Menga project, currently under construction, consists of a run-of-river intake underground concrete and steel lined power conduit surface powerhouse with two 25 MW units and a 132...

Isabella Project?Retrofit of Existing Tunnel
This paper explains conceptual methods of reinforcing and lining the section of the existing tunnel downstream of the three control gates to the exit portal and bifurcation for the power...

Lake Tap?Crater Lake
The Crater Lake Phase of the Snettisham Hydroelectric Project has been designed and is currently under construction. This paper describes the design and construction of the lake tap which...

Geotechnical Exploration?Rio Bravo Hydro Project
In order for the Rio Bravo Hydroelectric Project to become a reality, a thorough evaluation of alternative project configurations was necessary. Various power canal shapes, sizes, and...

Estimating Hydroelectric Operation and Maintenance
To improve the estimating of operation and maintenance costs for new small hydroelectric projects, an estimating model was developed. This model listed all of the operation and maintenance...

Snowden Hydroelectric Facility Expansion and Improvements
A geotechnical investigation was undertaken in October 1983. The investigation included core drill samples at the powerhouse, along the proposed dike, at the retaining walls and headgate...

TBM Tunnel Friction Values for the Kerckhoff 2 Project
In the mid-1970's Pacific Gas and Electric Company began design of the Kerckhoff 2 Hydroelectric Project, which supplements the Kerckhoff 1 project built in 1919. The Kerckhoff...

Hydraulic Design and Performance of Discharge Facilities at Revelstoke Project
Revelstoke Project is located in southeastern British Columbia on the Columbia River, 130 km downstream of the Mica Dam and approximately 5 km north of the City of Revelstoke. The project...

Hydropower in the Kodiak National Wildlife Refuge
The Terror Lake Hydroelectric Project is unique in that it is the only energy project to be constructed in a National Wildlife refuge. A National Wildlife Refuge has few equals to blocking...

No. 1 Water Wheel Project, Gilman, Vermont
This paper describes the replacement of an old generating unit with a new unit in a turn-of-the-century mill building where three other such units were already operating. The key issues...

Small Hydrodevelopment: An Owners Perspective?El Vado, New Mexico Hydroelectric Project
The construction of the El Vado Hydroelectric Project posed several unique problems. The joint ownership of the dam between a Federal and State agency was unique to the region. The proposal...

Pyrites Hydroelectric Project, Canton, New York
This paper describes the Pyrites Hydroelectric Project in Canton, New York, an 8-MW project completed in December 1985. The key to its successful development was a team approach that included...

After L'Ambiance Plaza
In the aftermath of the tragic collapse of the L'Ambiance Plaza apartment building at Bridgeport, Conn., in April 1987, reforms are being proposed. In 1987 ASCE approved writing...

 

 

 

 

Return to search