Turbine Efficiency Measurements by the Pressure-Time and the Current-Meter Method at Paugan
Paugan generating station was built in the 1920s. Although the generators were converted from 25 Hz to 60 Hz in the mid 1950s, the original runners were in place until recently when a...

Paradise River, a Challenging Small Hydro Development
The frequent assumption that small hydro developments are simple is not always borne out in practice. A case in point is the Paradise River Development in Newfoundland, Canada. This paper...

Outage Time and Its Effects on Rehabilitation Philosophy ? A Case Study
The Abitibi-Price Paper Mill located in Grand Falls, Newfoundland presently has eight (8) hydro-generating units in operation to assist in offsetting the power demands created through...

Small Hydro Power in British Columbia
Water Power '87 will be held in the Pacific Northwest. British Columbia is also part of this region and, as such, is also one of the homes of hydro power. To date, we have...

Mini/Micro Hydro Applications in Remote Off-grid Areas of Ontario
This paper outlines the potential for remote off-grid small hydro development in Ontario and the present incentives that exist to develop these resources. Estimated costs of development...

Small Hydro Analysis and Reporting Program
The Ontario Ministry of Energy initiated a project to develop an analysis program based upon metric measures and Canadian costs. The Ministry of Energy of the Province of Ontario has been...

Studies of Fish Protection Methods at Hydroelectric Plants
Five largely untested but economical fish-protection systems were tested at sites throughout North America. The process of selecting laboratory and field test sites was completed at the...

Environmental Appraisal of Small Hydro Projects in Ontario
Despite a large interest from the developing community and the aid of Ontario's Small Hydro Encouragement Program (Ministry of Energy 1986) which is administrated by the Ontario...

Operational Flexibility?A Precious Commodity
This discussion is about Operational Flexibility, as it applies to the generating resources of a large electricity system. The author discusses the situation at Ontario Hydro, operationally...

Columbia River Treaty Perspectives
The Columbia River Treaty was signed in 1961 and ratified by the governments of Canada and the United States in 1964. The Treaty required British Columbia to construct three large storage...

Multisite Hydrocomplex Optimization
A multisite complex is analysed in northern Quebec to decide the level of equipment needed that will supply firm energy at the best possible unitary price. Four possible sites were chosen...

Stochastic Optimization of Reservoir Systems Operations
This paper addresses the stochastic optimization of real-time monthly operations of multi-reservoir systems by Dynamic Programming. A two-stage optimization framework that consists of...

Hydrologic Design Methodologies for Small-Scale Hydro at Ungauged Sites
IMP is a microcomputer package for evaluating small-scale hydroelectric power sites in British Columbia. With IMP it should be possible for an experienced hydroelectric engineer to make...

Single Conduit Dam Design
In today's arena of increasingly higher costs for major dams, planners and designers are continuing to look into ways of reducing the overall costs for the development of...

Rock Engineering at Cat Arm Hydroelectric Development
Cat Arm Hydroelectric Development in Newfoundland, Canada, develops 129 MW from 384 m of head. The project was constructed between 1981 and 1984 and comprises 5 large dams, 5 small dams,...

Osoyoos Lake Control Structure
The new Osoyoos Lake Control Structure has been built on the Okanogan River at Oroville, Wa. The site is about 2 miles downstream from the outlet of Osoyoos Lake, and about 9 miles south...

Research and Development Program on Small Scale and Low Head Hydro by the Canadian Government
In July 1985 the Canadian Department of Energy, Mines and Resources (EMR) was assigned the responsibility for the federal support program for renewable energy R&D in Canada. In...

Hydraulic Design and Performance of Discharge Facilities at Revelstoke Project
Revelstoke Project is located in southeastern British Columbia on the Columbia River, 130 km downstream of the Mica Dam and approximately 5 km north of the City of Revelstoke. The project...

Field Testing: Producing Complete Test Results on Site, A Realistic Objective
Modern technologies and instruments have had an influence in nearly every field imaginable. At Hydro-Quebec, the last ten years have brought about a complete transformation in the way...

Finite Element Analyses of the St. Alban Test Embankments
Finite element analyses were performed of three embankments on sensitive clay that were constructed to failure at St. Alban, Quebec. One of the embankments was reinforced with flat-lying...

 

 

 

 