Assessment of the Sate-of-the-Art of Robotics Applications in Highway Construction and Maintenance
Automation and robotization in highway construction and maintenance are currently under active development in the United States and other countries around the world. Although road construction...

Highway Pavement Surfaces Reconstruction by Moire Interferometry
The necessary basis for any cost-effective highway and bridge deck pavement management program is reliable, complete and up-to-date information concerning the state of pavement surface....

Evaluation of Reliability of Road Network for Better Performance, Advanced Management and Future Network Design
This paper proposes reliability as a new indicator for advanced management and future construction of road networks; and also presents a new reliability analysis method. This article contains...

Maglev Technology: A Look at Guideway Construction and Maintenance Concerns
Magnetically levitated vehicle technology, maglev, serves as a potential solution to ever increasing transportation demands. Though interest in maglev appears to be increasing, an appropriate...

Two Approaches for Characterizing Images of Rail Surface Flaws
Rail surface flaws can be removed by grinding to improve the life of rail and provide a safe, smooth running surface. To avoid time consuming and costly visual inspection in the determination...

The U.K. Marina Industry?An Overview
This paper is written from the point of view of an established marina developer and operator and, as the title suggests, it purports to be nothing more than an overview of a number of...

Innovative Breakwater Designs on the Great Lakes
Extensive investigations have recently been undertaken to support the development of rubblemound breakwater designs for new marinas at Kenosha and Sheboygan, WI, both located on the west...

Economic Considerations of Marina Design
The planning and design of a marina involves decision making to optimize the economic return of the entire project. Decisions relating to land-use, water-use, and construction require...

Planning and Opening of Otaru Marina
This is the first time a Third Sector has been used in constructing a marina in Japan. The reasons for forming a Third Sector in constructing the Otaru Marina, its construction, and the...

North Point Marina ? A Case Study
North Point Marina is a full service, 1493 boat marina constructed by the State of Illinois on the shoreline of Lake Michigan to serve boaters from northeastern Illinois. Because of its...

Dana Point Harbor, Orange County, California (A Shallow-Draft Marina)
Dana Point is a shallow draft harbor for 2500 permanently moored vessels. Marina Amenities include boat launching ramps, trailered boat storage, a fuel dock, and sport fishing facilities....

Planning and Designing the Land and Water Human Environments in Marinas
Historically, the planning and design of marinas placed the greatest emphasis on solutions which served the inanimate objects comprising marinas-boats, docks, buildings, automobiles and...

Marina Cabo San Lucas?A Case Study
Designing and constructing a high quality, state-of-the-art marina is a difficult task in major metropolitan areas such as Los Angeles or San Francisco. But when the marina development...

Marinas in Mexico: The Opportunities and Drawbacks
This presentation outlines the major characteristics of marina development in Mexico. Specific examples are offered to support the proposition that Mexico conducts business in ways that...

Prospectus for Marinas 2000
This paper is an outline presentation of the method of achieving a proposed specialty workshop on marina planning, design, and construction for the Twenty-First Century by the Waterway,...

The Design & Construction of Marina Martinique, S. Africa
Marina Martinique is a coastal residential marina in the eastern Cape Province of South Africa which will ultimately accommodate 730 moorings and 1100 low rise residential units, most...

Design and Construction of Boat Launching Ramps
Although boat launching ramps are not 'high tech' facilities compared to many other types of waterfront construction, there is a continuing void of knowledge,...

Viscoelastomeric Connections in Seismic Structures
Nonlinear Kelvin and Maxwell impedances connect lumped masses to form arbitrary networks. Viscoelastomer-steel composite moment connections are modeled similarly, using auxiliary masses,...

Pavement Design for the New Denver International Airport
Denver International Airport is the first new major U.S. airport in twenty years. Primary airfield elements in Phase I development include 5-12,000 foot runways and 1-16,000 foot runway,...

Joint Spacing for Airfield Pavement
This paper looks at various factors affecting portland cement concrete(PCC) pavement cracking, with special emphasis on the effect of joint spacing on crack development. A rational approach...

 

 

 

 

Return to search