Real Time Modeling to Meet Flow Requirements at a Fossil Steam Plant
A real time modeling system has been developed to schedule hydropower operations in order to comply with discharge permit requirements at a downstream fossil steam plant. The modeling...
Roughness Coefficients of Large Floods
Most hydraulic calculations of flow in channels and overbank areas require an evaluation of flow resistance generally expressed as Manning's roughness coefficient, n. Literature...
Diversion Structure for Peak Flow Reduction
The flood control requirements of a planned development in the City of Orange, California were such that the peak discharges ranging from an annual flood up to 25-year return period be...
Factors Influencing Conveyance Efficiency
Losses from a water distribution system are inadequately defined by reference to only the gross conveyance efficiency (Ec) of the system. The various unavoidable and avoidable losses that...
Reservoirs Help On-Farm Operation and Automation
Reservoirs can be used to convert a less desirable set of flow rates and durations into a more desirable and flexible set of rates and durations. This will permit irrigation management...
Comparison of Surge and Continuous Flow Irrigation in California
With the closure of the Kesterson National Wildlife Refuge to drainwater disposal and the pending limits on tailwater flows to the San Joaquin River, decreasing deep percolation is of...
Tailwater Management with Surge Irrigation
Field data of surge irrigation has shown that, in the post-advance stage, there exists an optimum post-advance cycle time. Cycle time greater than or less than the optimum post-advance...
Infiltration as a Dependent Variable in Modeling Furrow Irrigation
Most surface irrigation models assume that infiltration is independent of surface flow hydraulics. However, wetted perimeter has been shown to significantly affect infiltration in furrows....
CWSI and Stomatal Resistance of Cotton and Soybeans
A new instrument, Scheduler(TRADEMARK), has been developed to measure the onset and duration of plant water stress. This device consists of a sensor package (containing an infrared thermometer,...
Steady State Fluid Transport Model for Plants
Knowledge of water potentials throughout the xylem and phloem elements as well as in individual cells is fundamental for understanding effects of water and temperature stress on transport...
Estimation of Mean Water Depth for Border Irrigation
The mean water depth for border irrigation is derived, using dam-break simple wave solution and boundary layer theory, as a function of inflow discharge, bottom slope, bottom roughness,...
Evaluation of Basin-Furrow Irrigation Systems
The division of the total flow into basin-furrows is analyzed using both energy and momentum principles. A zero-inertia model is applied to simulate the advance phase using different infiltration...
Estimating Number and Duration of On-Times for Surge Irrigation
Research shows surge flow can achieve efficient and uniform irrigation on some soils. However, most available information focuses on computerized analysis and modeling for research purposes....
Investigation of Main Supply Canal and Lateral Fluctuations
The Imperial Irrigation District and the U. S. Water Conservation Laboratory of Phoenix, Arizona are conducting a joint project to study the causes and effects of water level fluctuations...
Rating Curves for Adjustable Tricklers
This paper presents the approach and results of evaluating adjustable drip/trickle emitters to obtain rating curves. The emitter discharge depends on both system pressure and emitter opening...
Surge Flow?Automation of Surface Irrigation?At Last
The studies which led to the development of Surge Flow at Utah State University, began as an effort to automate surface irrigation systems. The first prototype models, were electric control...
Theoretical Flow Model for Drop Structures
A theoretical model based on the momentum equation is reviewed for a trapezoidal weir drop structure operating in a trapezoidal channel. Preliminary qualitative results indicate agreement...
Redundancy Evaluation of Existing Bridges
The redundancy of an existing bridge can only be correctly assessed by considering the full superstructure as a single entity. Any formulation based on the analysis of bridge components...
Calibration of a Bridge Rating Formula for Overload Permits
This paper proposes a method to calibrate a reliability based load and resistance factor design (LRFD) permit evaluation formulation that will account for the overloaded truck's...
LFRD Bridge Design as Viewed by the Designer
The load and resistance factor design (LFRD) design concept has been resisted by some bridge engineers on the grounds that it represents a reduction of the 'factor of safety'...
Return to search