Real Time Modeling to Meet Flow Requirements at a Fossil Steam Plant
by Barbara A. Miller, TVA, Norris, TN, USA,James A. Parsly, TVA, Norris, TN, USA,
Pete Ostrowski, Jr., TVA, Norris, TN, USA,
Document Type: Proceeding Paper
Part of: Hydraulic Engineering
Abstract:
A real time modeling system has been developed to schedule hydropower operations in order to comply with discharge permit requirements at a downstream fossil steam plant. The modeling system provides an interactive and efficient solution to complicated and highly unsteady flow conditions along a 44-mile river reach. Installation of the modeling system at the Tennessee Valley Authority Power Control Center and application of the model on a real time basis incorporates environmental constraints into the daily scheduling of hydropower and reservoir operations.
Subject Headings: Hydro power | Power plants | Steam power | Hydrologic models | Computer models | Water flow | Simulation models | Tennessee | United States
Services: Buy this book/Buy this article
Return to search