Dam Safety Rehabilitation at Selected TVA Hydroelectric Projects
In response to President Carter's 1976 memorandum to all Federal agencies with responsibility for dams to develop and implement formal guidelines for dam safety, TVA restructured...

Rapid Filling of Reservoirs
The rate of filling a reservoir, particularly for the first time, is governed by various factors. While economic considerations may favor rapid filling of reservoir to operational levels,...

Competitive Model Testing for Replacement Runners at the Wells Hydroelectric Project
The Wells Hydroelectric Project, located on the Columbia River, contains ten Kaplan-type turbines. The plant has been in commercial operation since January, 1969. The runners have a long...

Uprating Hydro Turbines and Generators
Various engineering evaluations of the turbine and generator components are required when considering uprating units. Often, certain turbine and generator components have to be redesigned...

The Twlefth Street Project?Multiple Uses on the Falls of the James River
This paper is about a hydroelectric project that was not built. The project is located in Richmond, Virginia on the James River. Project civil works, water rights and adjacent land are...

The Lowell Hydroelectric Project: A Case Study
The Lowell Hydroelectric Project, located on the Merrimack River in Lowell, Massachusetts, consists of an existing dam, canals, and turbine generating equipment presently operating at...

Negotiating Environmental Protection Measures with Resource Agencies: Twin Falls and Weeks Falls Hydroelectric Projects, Washington
The planning and licensing process for the Twin and Weeks Falls Projects involved resolution of numerous regulatory and environmental issues, including the need for cumulative impact analysis...

Public Involvement Strategies: A Case Study in Citizen Participation
Literally millions of dollars are wasted every year because authorized and funded water projects are stalled in court, hung up in administrative proceedings, or delayed while the project...

Importance of Public Consultation
Early consultation with governmental resource agencies as well as private environmental groups can mean the difference between early resolution of conflicts between developers and environmentalists...

Small Hydro Advocacy
The state public utilities commissions wield enormous power over the destiny of small hydro projects; power extending over rates, contract terms and dispute resolution. Yet developers...

Coordinating Engineering and Environmental Activities in Hydropower Development
This paper reviews the role of hydropower project personnel, particularly the interaction between project management, engineering, and environmental sciences staff in project planning...

Determination of the Effects of Multiple Small-Scale Hydroelectric Projects on Resources in a California River Basin: A Matrix Approach
In 1983, Section 306 of the Energy and Water Appropriation Act required the FERC to conduct a comprehensive water resource analysis in the Upper San Joaquin River Basin, California. A...

Oxygenation of Releases from Richard B. Russell Dam
In July 1972, the Georgia Department of Natural Resources requested the formation of a technical committee to analyze the water quality matters relating to the Russell project. Studies...

Fish Screens for Hydropower Developments
The paper reviews five screening systems that are now being used at hydropower developments. The screen types discussed have a demonstrated ability to meet agency fish screening criteria....

Design and Construction of Paute Project, Ecuador
The Paute Project is a key element in Ecuador's program for developing a modern electric power system. When fully developed, it will consist of three separate developments:...

Efficient Small Hydroelectric Plant Operation
This paper presents a review of operating and maintenance alternatives for small scale hydroelectric plants. The cost of operating a hydro project is largely determined by decisions made...

Independent Review of Truman Dam Operation
The Truman Dam in Missouri was constructed by the Army Corps of Engineers in 1979 as a pumped-storage facility. Due to fishkill and other controversies, the pumpback feature of the project...

Impacts of Indexed Sequential Hydrological Modeling on Hydrogeneration Capacity Estimation
Indexed sequential modeling (ISM) has been proposed by the Western Area Power Administration as an alternative approach to developing firm marketable capacity (i. e. , project dependable...

The Benefit/Cost Ratio of a Physical Model Study
The discussions of a physical model study often appear first in the Federal Energy Regulatory Commission ('FERC') consultation process and when appearing later...

Hydroelectric Project Design Using Microcomputers
The main issue in the first stage of a hydroelectric project is to assess the influence of hydrologic parameters on design and optimum sizing of the installation and on future energy production....

 

 

 

 

Return to search