Exhibits Under Fiberglass
The San Diego Convention Center, scheduled for completion in 1988, is located on 11 acres of downtown land only 150 ft from the bay. It will cost $130 million for total of 1.7 million...

Instant Jails
Prison planners are responding to the explosion in the prison population by stepping up construction of new jails. Because of the pressures imposed by court ordered deadlines, engineers,...

Shake-Proof Dams
Seismic trouble spots in California and along the Pacific Coast usually get the most publicity. But many people don't realize that Wyoming, Illinois, South Carolina, Utah...

Pipe-lining a Pipeline
This core prestressed concrete cylinder pipe is now lining the inside of a major water supply tunnel in Alaska. Occasionally found in rock tunnels, or buried pipelines, large diameter,...

Another Geotech Import: Deep Soil Mixing
A technique called deep soil mixing (DSM), imported from Japan, has been used to stabilize an existing dam foundation. When the Bureau of Reclamation discovered that Jackson Lake Dam had...

Milwaukee's Deep Tunnels�No Clone
Tunnel boring machines are excavating nearly 19 miles of tunnels 17-32 ft in diameter as part of Milwaukee's $1.9 billion upgrade of its sanitary sewage system. Laid out to...

Ruedi Dam Hydropower Project
The Ruedi Dam & Reservoir is owned and operated by the Bureau of Reclamation, U. S. Department of the Interior and is part of the Fryingpan-Arkansas transmountain diversion development....

Lemon Dam Hydropower Project
The Florida Water Conservancy District (District), the entity responsible for the operation of the dam and for repayment of the costs, had been interested in the hydropower potential of...

Town Bluff Dam, Texas: A Federal?Non-Federal Hydropower Partnership
Town Bluff Dam is located in southeast Texas, on the Neches River about 45 miles north of Beaumont, Texas. The dam is one element of the authorized Lower Neches and Angelina Rivers, Texas,...

Development of the Owyhee Dam Hydroelectric Project
The Owyhee Project Power Committee and Owyhee Irrigation District are developing the Owyhee Dam Power Plant, currently under construction in eastern Oregon. The power plant is being constructed...

The Cherokee Falls Hydroelectric Project
The 4 MW Cherokee Falls Hydroelectric Project is located near Gaffney, South Carolina, at the existing Cherokee Falls dam at mile 102 on the Broad River. The work involves constructing...

Mini Hydro at the Hackett Mills Project
The project includes rehabilitation of a timber crib dam and the first use of a Right Angle Drive turbine in the United States to generate power from the 16 feet of head available at the...

Hydropower on the Arkansas?A Non-Federal Development
In 1980, Arkansas Electric Cooperative Corporation (AECC) filed preliminary permit applications with the Federal Energy Regulatory Commission for developing the hydropower potential at...

Non-Federal Development at a Federal Dam: A Case Study
The 2. 8 MW Mt. Elbert Conduit Hydropower Project, developed by STS Energenics Ltd. Inc. , will begin operation mid-October, 1985. The powerhouse has been constructed and the turbine and...

Retrofit Hydropower at Corps of Engineers' Dams
The Sacramento District of the U. S. Army Corps of Engineers is responsible for the review of retrofit hydropower by non-federal entities at 14 dams in the District. This review actually...

Piedra Del Aguila�New Hydropower for Argentina
Construction commenced in early 1985 on the 1. 0 billion Piedra del Aguila Hydroelectric Project on the Rio Limay about 1200 km (750 mi) southwest of Buenos Aires, Argentina. The project...

Evaluation of a Pump-Storage Hydropower Facility
This paper summarizes the findings of the evaluations conducted by faculty of the University of Missouri and outside consultants regarding the downstream effects of Harry S. Truman Dam...

Prospects for Hydroelectric Power Development at Corps of Engineer Dams
There are two basic approaches to developing hydroelectric power facilities at Corps dams. The Corps can develop projects at the request of Congress through the authorization process....

Friant Power Project: Design and Construction?Non-Federal Power at a Reclamation Facility
Friant Dam, Millerton Reservoir, provides the principal water supply for the Friant Division Central Valley Project of the U. S. Bureau of Reclamation (Bureau). The dam is a 319-foot high...

Construction of Yellowtail Dam & Power Plant 63-65
The Yellowtail Unit of the Missouri River Basin project is located on the Bighorn River in south central Montana. The key feature of the unit is Yellowtail Dam which rises 525 ft. between...

 

 

 

 