Rock Engineering at Cat Arm Hydroelectric Development
Cat Arm Hydroelectric Development in Newfoundland, Canada, develops 129 MW from 384 m of head. The project was constructed between 1981 and 1984 and comprises 5 large dams, 5 small dams,...
The Effect of Geology on the Dinkey Creek Project
The proposed Dinkey Creek Project is located about 40 miles northeast of Fresno, California. The project consists of a 360-foot high rockfill dam, two powerhouses, 41,600 feet of power...
Bath County Tunnel System/Remedial Treatment Program
The Bath County Pumped Storage Project, owned jointly by Virginia Electric and Power Company and Allegheny Generating Company, is located 70 miles (112 km) north of Roanoke, Virginia....
Sidney A Murray Jr. Hydroelectric Project
The Sidney A Murray Jr. Hydroelectric Project is being designed and constructed by EBASCO Services Inc. for the City of Vidalia (La) - Catalyst, Old River Hydroelectric Ltd Partnership....
Lake Tap?Crater Lake
The Crater Lake Phase of the Snettisham Hydroelectric Project has been designed and is currently under construction. This paper describes the design and construction of the lake tap which...
Geotechnical Exploration?Rio Bravo Hydro Project
In order for the Rio Bravo Hydroelectric Project to become a reality, a thorough evaluation of alternative project configurations was necessary. Various power canal shapes, sizes, and...
Estimating Hydroelectric Operation and Maintenance
To improve the estimating of operation and maintenance costs for new small hydroelectric projects, an estimating model was developed. This model listed all of the operation and maintenance...
Frazil Ice Control Using Electromechanical Cibrators and Ice-Resistant Coatings
Two methods, using electromechanical vibrators and ice-resistant coatings, were studied in a small-scale test conducted at the U. S. Army Cold Regions Research and Engineering Laboratory...
Snowden Hydroelectric Facility Expansion and Improvements
A geotechnical investigation was undertaken in October 1983. The investigation included core drill samples at the powerhouse, along the proposed dike, at the retaining walls and headgate...
High Pressure Grouting of the Bath County Tunnel System
A major grouting program was completed at the Bath County Pumped Storage Project between March and September 1985. High pressure grouting for seepage reduction was completed in a total...
The Gem State Hydropower Project
The Gem State Hydroelectric Project is located on the Snake River about 5 miles southwest of the City of Idaho Falls, Idaho. The project consists of a 40-foot high, 900-foot-long earth...
Dongjiang Project and Development of Lei River
Lei River in the south of Hunan Province is a tributary of Xiang River, flowing northward to the Yangtze River. Dongjiang has been selected as the key project to be constructed for hydropower...
Variable Speed Generators in Hydro Applications
This paper discusses the investigation of the doubly-fed variable speed machine as a potential candidate to convert a varying input speed to a constant frequency, constant voltage output....
Research and Development Program on Small Scale and Low Head Hydro by the Canadian Government
In July 1985 the Canadian Department of Energy, Mines and Resources (EMR) was assigned the responsibility for the federal support program for renewable energy R&D in Canada. In...
Characteristics of the Roesel Machine Used for Small Scale Hydro/Wind or Sea Wave Electric Power Generation and Storage
An electrical machine with property of synchronous as well as asynchronous characteristics and based on ceramic magnet programming technology by continuous printing of the desired number...
A Mathematical Model for Traveling Screens at Hydropower Plants
Hydroelectric projects cause significant mortality to fish migrating downstream. The current method to reduce fish mortality at hydropower plants is the use of traveling screens. In this...
The Impact of Inlet Flow Characteristics on Low Head Hydro Projects
This paper discusses the intake civil designs, addressing head loss and flow distribution into the turbine intake. The impact of poor flow quality on head losses, turbine performance,...
Analysis of Hydraulic Transients for Design and Operation of Two Powerhouses in Series
The Dinkey Creek Project will be located in the southern Sierra Nevada mountains 40 miles north-east of Fresno, California, and will develop about 4000 ft of gross head with a maximum...
Design and Operation of a Differential Surge Tank
The differential type of surge tank is more effective in operation than the simple type because it reacts more quickly to load changes of all sizes. The differential tank is also usually...
Case Study: Siphon Penstock Operations
Hydroelectric power plants utilizing siphon penstocks operating near Winter, Wisconsin and at Jim Falls, Wisconsin have met or exceeded expectations after fine tuning of the vacuum and...