Devil Canyon Second Afterbay
This project is located in the City of San Bernardino (Southern California). The addition of a second afterbay for the Devil Canyon Powerplant has been in the planning stages since October,...

Case Study Incremental Approach to Cost Analysis for Improvements to Wise Powerhouse Penstock
In 1980, Pacific Gas and Electric Company (PG&E) began studying the addition of a second powerhouse to the existing Wise Hydroelectric Project. Because of the existing project...

Economic Trade-Off between Hydropower and Other Competing Water Uses: A Case of Coteau Creek Station
Using the Coteau Creek hydropower generating station in Saskatchewan as a case study, economic trade-offs between water used for hydropower generation, and irrigation and recreational...

Uplift under Concrete Dams on Rock
While the possible existence of uplift pressures within dams and foundations is no longer questioned, there is still considerable controversy over the magnitude and distribution of uplift...

Uplift Pressures in Existing Concrete Dams
This paper is a brief summary of a report of the same title prepared for the Electric Power Research Institute (EPRI) as part of its program to study ways to economically improve dam safety....

Uplift Pressure below Gravity Dams on Rock
The magnitude of the uplift force at the base of a concrete gravity dam founded on rock is strongly dependent on the properties of the discontinuities within the rock mass. This paper...

Effect of Seepage in Cracks in Older Gravity Dams
One of the many problems encountered by dam designers is that of estimating uplift pressures in cracks within older concrete dams. As part of ongoing research, we are investigating this...

Effects of the Environmental Approval Process on Project Scheduling and Economics
The environmental approval process is fundamental to the permitting of hydropower projects. Recent changes in permitting requirements has had a significant effect on the cost and schedule...

Optimum Use of the Water Resource a Factor in the Hydroelectric Relicense Process
To meet Federal Energy Regulatory Commission (FERC) requirements for a new license, owners must demonstrate full development of the available water resource. This paper presents an approach...

Evaluating Financial Performance of Public and Private Firms Involved in Hydropower Development
The extended abstract compares companies that have gone public and the authors' own company which is private. Included are five publicly, or formerly publicly traded companies...

Design Data of Kaplan and Bulb Turbine Units
Some basic statistical data covering geometrical and energy parameters for Kaplan and bulb turbine units are presented. These data are further compared as specific rations for both units,...

Analysis of Concrete Gravity Dams Using Microcomputers
Monenco Consultants Limited has developed a microcomputer program entitled 'DS2' for the stability analysis of concrete gravity dams. This paper discusses this...

Evaluating Uplift Pressures for Concrete Gravity Dams
An approach for evaluating uplift and dam foundation conditions, which resulted from the initial phases of an Electric Power Research Institute (EPRI) study is presented. An earlier study...

Coastal Zone '89
Coastal Zone '89 is the sixth in a series of multidisciplinary meetings on comprehensive coastal and ocean management. The papers included in this publication review technical...

Hydro on Hold
Hydropower projects have become the target of a growing environmental movement overseas. The tradeoff between clean, renewable energy and the possible environmental impacts of the reservoirs...

Glitches in Flitch Beam Design
Wiesenfeld proposes a set of design criteria for flitch beams. These beams, in which wood and steel sections are bolted together to act as a single structural unit, are currently covered...

Waterpower '89
The 1980's have been characterized as an era of uncertainty for world energy including future demand for energy, fuel prices and availability, regulatory constraints, environmental...

Regulatory Impact Statements
This paper suggests the issue of regulatory impacts be addressed in a manner analogous to environmental impacts, using a timely, comprehensive methodology. By 'timely'...

High Speed Multi-Link Automated Control
A new manipulator control technique is being investigated with potential for improving equipment life and productivity without requiring more operator training. It can retrofit to multi-link...

Human Factors of Project Organization
The nature of construction demands people who can move with the unique and dynamic conditions of the changing environment. Knowing the requirements of the project environment and culture...

 

 

 

 