Practical Approaches Used in Neutron Meter Moisture Monitoring
This paper describes a practical, appropriate methodology for utilizing neutron meter soil moisture measurements to provide irrigation management information to farmers. A neutron meter...

Landslides and Cherry Trees -- Upgrading the Dalles Irrigation District
The Dalles Irrigation District recently began the process of applying for a federal loan to finance upgrading of the District's distribution system. The process included preparation...

An Evaluation of the Large Mammal Entry/Escape Steps Coachella Canal In-Place Lining Project
This study evaluated the effectiveness of a new system of large mammal entry/escape steps as part of the environmental investigations for the Coachella Canal In-place Lining Prototype,...

Arid Lands - Impending Water-Population Crises
Many developing countries in arid lands will face major food production problems because of population growth rates. Irrigation water requirements will soon exceed available renewable...

The Colorado River Water Rights: Back to the Future
A discussion about tomorrow's projected water shortages in California and efforts to meet the anticipated demands through the Colorado River supply requires at least a brief...

Future Transfers of Water and Conveyance Capacity Between the CVP and the California SWP
On November 24, 1986, the Bureau of Reclamation (USBR) and the California Department of Water Resources (DWR) executed an agreement known as the Coordinated Operations Agreement or COA....

Conjunctive Use of Surface and Groundwater Resources in the Central Valley of California
California Department of Water Resources (DWR) is evaluating the feasibility of incorporating a conjunctive use program into the State Water Project (SWP) to augment its delivery capability...

Shop Creek Stormwater Quality Enhancement Project
The advent of NPDES regulations for stormwater discharges creates a need to verify, on a regional basis, the effectiveness of emerging water-quality control technologies such as extended...

Modification to John H. Overton Lock and Dam
The Red River Waterway Project, Mississippi River to Shreveport, Louisiana, will consist of a navigation channel 9 feet (2.7m) deep by 200 feet (61.0m) wide, 5 locks and dams providing...

An Expert Advisor for Selective Withdrawal Operations
A rule-based computational advisor that aids in the selection of selective withdrawal operations for project release temperature maintenance is discussed. This advisor couples a one-dimensional...

Development of a Computer Aided Decision Process for Channel Rehabilitation and Watershed Enhancement Techniques
To assist the engineer in planning and design of channel stabilization measures, an expert system (CADWET) was developed using a commercially available expert system shell program. The...

Geomorphic and Sedimentologic Evaluation of a Proposed Flood Control Project, Truckee River, Reno, Nevada
Geomorphic observations, sediment data and shear stress analyses were integrated to evaluate the potential responses of the steep, coarse grained Truckee River to a proposed flood control...

Evaluation of Streambank Erosion Control Demonstration Projects
The Streambank Erosion Control Evaluation and Demonstration (SECED) Act of 1974 (Section 32 of Public Law 93-251) was enacted by Congress to obtain information on costs and performance...

Utilization of Stormwater Runoff to Recharge Underlying Aquifer
The expanding economy in Oman has led to rapid development in the Capital area. Water is critical to sustaining this rapid growth, and new sources of water are being sought to meet the...

The Piedra del Aguila Project Large Radial Gates
Piedra del Aguila Hydroelectric Project is on the Limay River in Argentina. It has a capacity of 1424 MW with annual energy of 5500 GWH. This is an overflow dam, with intake gates, penstocks...

Top Projects 1990
A dam, a bridge, an expressway, an interchange, flood control improvements, wastewater treatment and a dredged material containment embankment round out the 1990 Outstanding Civil Engineering...

Review of Garolim Tidal Power Project
The feasibility study of Garolim tidal power project made in 1981 was reviewed in 1986 and updated in 1988. The review study generally confirmed the result of the 1981 study. The generator...

Major Development and Transportation Projects
Public/Private Partnerships
This proceedings for Major Development and Transportation Projects contains papers and discussion summaries from the specialty conference Major Development and Transportation Projects:...

Let the Buyer Beware
As recently as the 1970s, state highway agencies blindly purchased land for projects without much concern for hazardous waste. But that changed in 1980 with Superfund legislation, specifically...

More Than a Public Hearing
Too often, required community input is reduced to the sometimes dreaded public hearing. Many formal public-involvement programs are comprised of no more than this minimal, yet essential,...

 

 

 

 

Return to search