Infrastructure Investment During a Boom/Bust Cycle
During a boom period, a utility can find itself in a position where the usual rules of thumb for making investment decisions are no longer trusted. If the utility enters the boom period...

Rehabilitation Model for Water Distribution Systems
This paper presents an optimization model for determining the minimum cost rehabilitation and replacement of pipes in water distribution systems. The advantages of the proposed model include...

Balancing Needs: Growth & Infrastructure Rehabilitation
Long range planning must include more than construction of facilities to meet new demands for service. A conscious effort must be made to balance the need for additional facilities with...

Cost-Effective Maintenance and Replacement Scheduling
The paper discusses operations research approaches to scheduling maintenance on components of water resources infrastructure. Cost and reliability objectives are explicitly considered....

Pretty Pictures & More GIS for Water Utilities
This paper considers the traditional activities of water utilities, and the solutions that will yield short and longer term requirements. These needs are then contrasted with the capabilities...

Probabilistic Analysis of Maintenance Options
Maintenance usually means service disruption, repair cost and loss of production. This is especially true for structures or components which provide basic infrastructure services, such...

Economic Assessment of Infrastructural Development for the Gurara River in Nigeria
Based on the preliminary designs of the hydraulic structures for the proposed Gurara river water development project in Nigeria, an economic feasibility analysis is presented. The cost...

Realities of Infrastructure Financing
Federal financing of water supply and water treatment projects will continue to decrease as capital demands continue to increase for expansion of water supply, to replace aging systems,...

Recognizing Institutional Barriers in Regionalizing Water Supply Infrastructure
The Northern Colorado Water Conservancy District (District) is conducting a study to determine the feasibility of implementing expanded regional cooperation for future municipal and industrial...

Legal Issues Presented by the Regionalization of a Water System
The joint development of a water supply and related infrastructure ('regionalization') by independent municipal and private entities presents legal and institutional...

Incentives for Regionalization of Water Supply Infrastructure
Regionalization of water supply entails an agreement between two or more previously independent water suppliers wherein regionalization offers each something more than they could obtain...

Managing Water During Drought
In response to the problems that recent droughts have exposed, the Corps of Engineers is conducting the National Water Management During Drought Study. The primary purpose of the study...

Utilization of Stormwater Runoff to Recharge Underlying Aquifer
Based on the available data and its proximity to the Capital area, Wadi Al Khawd was selected as the site of the first aquifer recharge project in Oman. The project was designed by Stanley...

Financing Small Water Supply Projects in Colorado
In order to meet the water supply needs of Colorado communities and the requirements of the Safe Drinking Water Act of 1986, the Colorado Water Resources and Power Development Authority...

Developing a Privately Owned Utility in Florida: Financing and Cash Flow
Private developers of a 5,000-acre master-planned community in Sarasota, Florida, were required to provide their own wastewater treatment plants as a condition for obtaining permits. After...

An Analysis of the Impact of Weather Variation on Monthly Water Demand
A methodology is utilized to analyze and model the impact of weather variation on monthly long distance water deliveries in Southern California. Monthly water demand is viewed as a combination...

Water Utility Demand Forecasting Using Lotus 1-2-3 Spreadsheet
In this study, a technique has been developed using Lotus 1-2-3 spreadsheet for distributing projected populations to small sectors throughout the study area. This procedure divides the...

The Multi-Watfore Method: A Water Demand Forecasting System
The multi-Watfore method, which combines the cascade model and a first order analysis of uncertainty, is a system of practical steps to develop models of water demand while generating...

Preliminary Report of the Feasibility of an Interbasin Water Transfer Through Existing Canal Systems
A preliminary feasibility study of the interbasin transport of water from the Sabine River on the Texas Louisiana border to the San Jacinto River Basin, northeast of Houston, Texas, using...

A Water Pricing Model for Lake Texana
Faced with water sales and recreation revenues insufficient to service the project debt, the Lavaca-Navidad River Authority (L-NRA), operators of Lake Texana, decided upon a novel approach...

 

 

 

 

Return to search