Siphon Penstock Installations at Hydroelectric Projects: A Survey of Design, Construction and Operating Experience
There can be advantages to using siphon penstocks at small hydro projects, particularly those constructed at existing dams. One problem, however, is a lack of documentation of siphon penstock...
Crescent and Vischer Ferry Hydroelectric Redevelopment Projects
The owners of aging small hydro plants face a myriad of complex technical, economic, and regulatory challenges as they seek to reliance and prepare their projects for continued operation...
Paradise River, a Challenging Small Hydro Development
The frequent assumption that small hydro developments are simple is not always borne out in practice. A case in point is the Paradise River Development in Newfoundland, Canada. This paper...
A Non-Federal Development at a Federal Project
The Colebrook River Lake project is a Corps of Engineers multipurpose reservoir located in northwestern Connecticut. The hydro project, designed and built by the Catalyst Energy Corporation...
Harnessing the Snake: A Construction Viewpoint
The Gem State Hydroelectric Project, five miles south of Idaho Falls, Idaho on the Snake River, consists of a 900-foot-long, 40-foot-high dam; approximately four miles of earthend dikes;...
Pumping System Permits Diversion of Water River Dam
For project construction at an existing Corps of Engineers' dam in New Mexico, where modifications to the existing outlet works were performed, a barge-mounted pumping system...
Buffalo Bill Dam Modifications?Modification of an Existing Bureau of Reclamation Facility to Increase Power Generation
This paper describes a joint venture between the United States Bureau of Reclamation and the State of Wyoming to increase the storage capacity and power generation capacity of Buffalo...
Transient Analysis of the Finchaa Hydroelectric Project
An iterative computer simulation procedure called LIQT (Liquid Transient), which performs simulations of hydraulic transients in closed conduit hydro-power systems, is used to estimate...
Hydropower Analysis Using Electronic Spreadsheets
A sequential streamflow routing procedure is recommended to overcome the inadequacy of the conventional duration curve analysis, especially in cases involving multiple intakes for capturing...
FERC Licensing: The Water Resources Engineers Role
As a result of the Electric Consumers Protection Act (ECPA) of 1986, the Federal Energy Regulatory Commission (FERC) is obligated to give equal consideration to non power uses of hydroelectric...
Modeling Sedimentation Problems at Hydro Developments
Sedimentation embodies the processes of erosion, transportation and deposition of sediments. At hydro developments, sedimentation can create problems. Computer sedimentation models (CSM's)...
Analysis of Unsteady Flows in Irrigation Canals Due to Load Rejection in Hydroelectric Project
An add-on hydroelectric project has been proposed for the Owyhee Tunnel No. 1, a component of the Owyhee Irrigation Project constructed in the 1930's by the U.S. Bureau of...
Implementation of a General Purpose Site Monitoring Network
STS Hydropower owns and operates several hydroelectric plants distributed throughout the United States. These plants, equipped with intelligent controllers, have been remotely monitored...
Recent Developments in Computer Based Control Systems for Hydro Power Control
In recent years microcomputer technology has come to dominate electric control systems. Modern control equipment provides many convenient means for ensuring easy, precise and safe operation...
Successful Behavioral Devices for Fish Protection
Since 1987, the Electric Power Research Institute (EPRI) has been sponsoring studies of behavioral barrier devices for protecting fish at hydroelectric facilities. Primary emphasis has...
Evaluating Uplift Pressures for Concrete Gravity Dams
An approach for evaluating uplift and dam foundation conditions, which resulted from the initial phases of an Electric Power Research Institute (EPRI) study is presented. An earlier study...
Tarbella?Third Extension Project Units 11 to 14: 440 MW Francis Turbine Design
At Tarbela Dam in northern Pakistan, the Third Extension Project, units 11 to 14 of 440 MW each, is presently under construction. When completed in 1992, the multipurpose hydro-irrigation...
Fluctuating Pressure Measurements on a Large Hydro Turbine
The New York Power Authority is investigating the feasibility of upgrading the thirteen 150,000 kW turbines-generators at the Robert Moses Niagara Power Station to improve efficiency and...
Digital Data Acquisition and Performance Testing of Hydroelectric Equipment
The U.S. Army Corps of Engineers Hydroelectric Design Center has elected to use digital data acquisition methods when conducting performance tests of hydroelectric units. Transducers have...
Renewal of the Burt Dam Generating Station
The present redeveloped hydro facility operates as a 300 kW run-of-river station automated by a head pond level controller which adjusts turbine setting to match available river discharge....
Return to search