Brule Project Spillway Rehabilitation and Expansion
Brule Hydroelectric Project is located near Florence, Wisconsin, on the Brule River about 1.5 miles upstream of its confluence with the Michigamme River. The 80 year old dam developes...

Energy in the 90's
This proceedings consists of papers presented at the specialty conference Energy in the Nineties which was sponsored by the Energy Division of the American Society of Civil Engineers and...

Evaluation of the Feasibility to Retrofit Stormwater Control Facilities to Improve Pollutant Removal Performance
This paper presents the results of an analysis that was performed to predict the efficiency of removal for suspended sediments in storm runoff under existing conditions and under several...

Diagnostic Options for Pipeline Rehabilitation
The various diagnostic options utilized for solving pipeline problems/failures continue to increase at a very rapid pace. Field reconnaisance and/or man-entry of pipelines is becoming...

Rehabilitation of Urban Pipelines
The City of Los Angeles is embarking on a replacement and rehabilitation program for the distressed portions of its sanitary sewer system which will cost in the hundreds of millions of...

Development of an Optimal Strategy for Storm Sewer Infrastructure Rehabilitation
Rehabilitation of the nation's infrastructure will require a significant expenditure of public funds in the near future. Efficient management of these funds will require tools...

1991 Update on Sanitary Sewer Rehabilitation Metropolitan Chicago
The Metropolitan Water Reclamation District of Greater Chicago (MWRDGC) owns intercepting sewers and seven water reclamation plants, but 125 local communities own the local sewers which...

Water Distribution Infrastructure Analysis
Water distribution systems in many older cities of the United States need rehabilitation. Because the rehabilitation costs of the nation's water systems will involve billions...

Los Angeles' Pipeline Rehabilitation Program
One-third of the City of Los Angeles' 7,000 mile water distribution system had been installed without internal protection. The Water System is aiming for a 900,000 foot per...

Levee Failure at Elba, Alabama
In March 1990, flooding resulted in levee failure at Elba, Alabama. The levee project was constructed in 1938 by the Works Progress Administration to provide protection to the city from...

Rehabilitation of Water Distribution Systems Planning and Implementation
The paper describes the approach taken to develop infrastructure rehabilitation procedures for Water Distribution Systems. Early research attempted to develop a mains condition oriented...

Hurricane Retrofit
Houston's Sheraton Hotel and Convention Center has been retrofitted to protect it from panel pop-out (separation from building curtain walls) and curtain-wall separation from...

An Overview of Hurricane Damage to Military Facilities and the Storm Recovery Role Played by the Southern Division Naval Facilities Engineering Command
Hurricane Hugo struck a major blow to the military's shore facilities at Charleston, SC and Sumter, SC. The Air Force Base at Myrtle Beach, SC suffered only minor damage....

Using GIS Technology in Assessing the Impact of the SC Beachfront Management Act Following Hurricane Hugo
The 1988 South Carolina Beachfront Management Act was passed into law as a means to protect South Carolina's valuable and fragile coastline by ensuring a gradual retreat from...

Rehabilitation of Vertical Thin-Walled Breakwater
Physical hydraulic model tests were conducted to measure wave transmission and force characteristics of a partial vertical thin-walled breakwater. Tests were run for the breakwater in...

Hydropower: Making Its Mark in North America
To discover what plans North American hydropower producers have for their hydroelectric resources in the 1990s, Hydro Review conducted a survey of leaders in the hydro generation industry...

Design Considerations for Radial Key Retrofit
A practise that is becoming more and more common is to retrofit hydro-electric generators with Radial Key Systems. There are significant design considerations that must be made to ensure...

Rehabilitation and Replacement of Slab and Buttress Dams at the Wissota Hydroelectric Project
The Wissota Hydroelectric Project is a 70 year old slab and buttress dam which required rehabilitation due to deteriorating concrete. Due to restrictions imposed by the FERC and Owner,...

The Stabilization of Minidoka Powerplant and Dam
The rehabilitation of structures can pose numerous challenges to the engineer. The structure historical preservation, the benefit cost ratio of the rehabilitation, and the stability of...

Dam Safety Rehabilitation of the T.V.A. Nickajack Hydroelectric Project
Safety of its dams has always been of great concern to the Tennessee Valley Authority (TVA). The agency has throughout its history enforced conservative designs, good construction practices,...

 

 

 

 

Return to search