How to Provide Shoreline Public Access
Methods of providing access facilities are covered which range from outright acquisition, obtaining public easements, and converting street ends to conditioning development permits. The...

Applications of an Integrated Traffic Analysis Package
This paper presents an integrated traffic analysis package called AAP (the Arterial Analysis Package). AAP, which was developed by the Federal Highway Administration (FHWA), contains three...

Comparison of TRC 212 and SR 209 LOS Calculations
With the release in 1985 of Transportation Research Board (TRB) Special Report (SR) 209, numerous traffic engineering agencies began the transition to new methods of calculating capacity...

Modeling Dual-Ring Actuated Signals with TRANSYT-7F
Current and potential future methods of using the TRANSYT-7F computer program to model dual-ring actuated traffic signals are discussed. First the problems encountered in using this fixed-time...

SIDRA?An Australian Program for Signalised Intersection Analysis
As more complicated signal phasing systems have been implemented in practice, the analysis methods have moved from a phase-control philosophy applied to approach roads to a group-control...

ITEEMS: Reducing Mainframe Systems to Micro-scale
The Integrated Traffic Engineering and Enforcement Monitoring System (ITEEMS) is a microcomputer-based system which has an on-line display and analysis of accident records by street intersection,...

The Twlefth Street Project?Multiple Uses on the Falls of the James River
This paper is about a hydroelectric project that was not built. The project is located in Richmond, Virginia on the James River. Project civil works, water rights and adjacent land are...

Safety Impacts of Installing Pedestrian Crosswalks
At-grade pedestrian crossovers (PXO's) have been installed at about 700 locations in Metropolitan Toronto to assist pedestrians in crossing busy streets at minimal delay to...

Selecting a Stormwater Service Level for Urban Control
Recently, more and more emphasis is being placed on the maintenance of pre- and post-development runoff peaks from a specified design storm. The limit on post-development flood peaks requires...

Subdivider: Advanced Subdivision Design with the IBM-PC
SUBDIVIDER is an IBM-PC program which aids engineers in the process of dividing tracts of land into lots, streets, and building floor plans. It can be used for the design of traditional...

Coordination of Interconnected Arterial Traffic Signals
Present analytical methods and computer programs offer capabilities of optimizing the traffic signal coordination for a series of signalized intersections. Recently, transportation research...

Designing People Places
Designing people places on the waterfront relies on first satisfying people's needs. The needs of people in public places (both on and off the waterfront) include at least...

Street Fares
An argument is made for imposing user fees to amass funds for repair and maintenance of local roads and streets. These infrastructure services have to compete for local general property...

Parking Efficiency Through Shared Parking Concepts
Due to continuing demand for concentrated parking supply in our urban areas, developers and public agencies must devote a significant amount of their resources and energies to providing...

The United States Used to be a Great Country...
Up until 20 years ago, the American highway departments did a good job of maintaining bridges and they kept streets well paved. The public works departments maintained the water and sewer...

Mixed Use, Mixed Materials
Tabor Center is a $330 million office/commercial/hotel complex in Denver's urban renewal area. The two block site is bisected by a street that had to be kept open during construction....

Floodplain Modeling for the Henry Street Basin
A study focusing on the primary conveyance system in the 5. 7 mi**2 Henry Street Drainage Basin in Hillsborough County, Florida was conducted to develop remedial measures for the control...

The Resident Engineer as Construction Team Member
The success of a construction project is affected by the actions of the resident engineer (RE). Good REs don't come off the street; they are developed through training and...

Use of Microcomputers in Transportation: Potential, Limitations and Future Trends
An overview is given of the existing programs for microcomputer applications in transportation with emphasis in software for traffic analysis and management. The impacts of the increased...

Queueing Applications for Stop Sign Operation
A pair of programs has been developed as a teaching tool to illustrate the application of simple queueing principles to transportation problems as taught in an introductory course in Transportation...

 

 

 

 