Oxygenation of Releases from Richard B. Russell Dam
In July 1972, the Georgia Department of Natural Resources requested the formation of a technical committee to analyze the water quality matters relating to the Russell project. Studies...
Gas Bubble Disease in Trout Below a Low Dam
Research and efforts to reduce nitrogen supersaturation which is affecting trout in the Bighorn River, Montana, below Yellowtail Afterbay Dam is described. Nitrogen supersaturation can...
Fish Studies for a Small Hydroplant in Michigan
The Morrow Lake hydroelectric project is a new facility which is scheduled to become operational in August 1985. A study has been developed consisting of two main parts: Potential change...
Simulation of the Pit 3, 4 and 5 Hydroelectric Project Using the USFWS Instream Temperature Model
The Pit River in Shasta County, California, is the site of the Pit 3, 4, and 5 Project (Project). A two-year Bald Eagle and Fish Study was initiated in March 1983. As part of the overall...
Preventing Fish Mortality at a Large Pumped Storage Plant
A field study program was initiated at the Truman Project to obtain a better understanding of which fish species in the tailrace area would be most susceptible to turbine passage, determine...
Fish Screens for Hydropower Developments
The paper reviews five screening systems that are now being used at hydropower developments. The screen types discussed have a demonstrated ability to meet agency fish screening criteria....
Assessment of Probable Fishery Impacts of Hydroelectric Development at Lock and Dam No. 26 (Replacement), Mississippi River
Early coordination with affected Federal and state agencies allowed completion of an Environmental Assessment for a hydroelectric plant proposed for Lock and Dam No. 26 (Replacement)....
Real Time Information Systems for Improved Port Operations
The technology to make appropriate measurements and to forecast conditions for short intervals is available today. Simple collection, analysis and dissemination systems are within the...
Salmon Restoration: Blessing, Bane or Boondoggle?
The 'strategic' plans for the Atlantic Salmon Restoration Program were examined to determine what the strategy of the U. S. Fish and Wildlife Service is for this...
Design and Construction of Paute Project, Ecuador
The Paute Project is a key element in Ecuador's program for developing a modern electric power system. When fully developed, it will consist of three separate developments:...
U.S.-China's Cooperation in Unified Resource Development
This paper reports on activities between China and the United States involving exchange of technical expertise and project development. The paper focuses on how unified resource development...
Efficient Small Hydroelectric Plant Operation
This paper presents a review of operating and maintenance alternatives for small scale hydroelectric plants. The cost of operating a hydro project is largely determined by decisions made...
Optimal Dispatch of Hydroelectric Systems
This paper presents a reliable and computationally efficient method for solving the optimal hydro dispatch problem. Moreover, this method guarantees a true optimal solution when the units'...
Quantifying the Maximum Capability of Hydroplants
A procedure was developed to quantify the maximum hydropower capability. This procedure basically consists of two steps: dividing the total available water into weekday and weekend components;...
Independent Review of Truman Dam Operation
The Truman Dam in Missouri was constructed by the Army Corps of Engineers in 1979 as a pumped-storage facility. Due to fishkill and other controversies, the pumpback feature of the project...
Impacts of Indexed Sequential Hydrological Modeling on Hydrogeneration Capacity Estimation
Indexed sequential modeling (ISM) has been proposed by the Western Area Power Administration as an alternative approach to developing firm marketable capacity (i. e. , project dependable...
The Benefit/Cost Ratio of a Physical Model Study
The discussions of a physical model study often appear first in the Federal Energy Regulatory Commission ('FERC') consultation process and when appearing later...
Hydroelectric Project Design Using Microcomputers
The main issue in the first stage of a hydroelectric project is to assess the influence of hydrologic parameters on design and optimum sizing of the installation and on future energy production....
Hydro Systems Evaluation on Personal Computers
The programs for selecting the equipment and determining the average annual energy have been separated from the detailed financial analysis. The BASIC language was selected for the first...
Simulation of River Ice Processes on Alaska's Susitna River
A numerical river ice model is applied to an 85-mile reach of Alaska's Susitna River immediately downstream of the proposed Susitna Hydroelectric Project. The model is designed...
Return to search