An Investigation into Causes of Bank Caving
A series of investigations into bank caving along the Ohio River are described. These investigations include a study of the distribution of precipitation in the study region, derivation...
Considerations in the Design and Installation of Horizontally Drilled Pipeline River Crossings
The authors will present a review of directionally controlled horizontal drilling techniques for pipeline installation by describing the state-of-the-art of the process vis-a-vis subsurface...
Irrigation Intervention Analysis of Drainage SAR
G.E.P. Box-G.M. Jenkins time series analysis, with irrigation applications as an intervention function, was used to study temporal and spatial variabilities of sodium adsorption ratios...
Investigation of Runoff from a Subsurface Drained Field
This paper examines the relationship among rainfall, water table level and runoff hydrographs for subsurface-drained farmlands. It was found that peak flows were greatly influenced by...
DSS: A Dam Site Selector Expert System
The Dam Site Selector (DSS) expert system is an aid for rating an area for use as a dam site and reservoir. It was developed for use in a graduate level hydrology design course at Purdue...
Atrazine in Subsurface Drain Water in Southern Louisiana
Atrazine was applied preemergent to corn on subsurface drained and undrained plots. Atrazine soil concentration and concentration and loss in drain water were determined for 243 days after...
Trace Elements and Pesticides in Salton Sea Area, California
Concentrations of numerous potentially toxic trace elements and pesticides were determined in water, sediment, and biota from the Salton Sea area in southestern California. Comparison...
Entrainment of Bed Sediment by Density Underflows
The erosion caused by a density-driven underflow has been studied experimentally. The observations indicate that a strong density current can entrain substantial amounts of bed sediment....
Utilization of Ground Penetrating Radar to Conduct Sediment Surveys of Frozen Reservoirs
The ground penetrating radar (GPR) system consisted of a control unit, antenna, recorder, a power supply on a sled towed by a snowmobile. A 120 Mhz antenna was utilized and gave excellent...
Air Power Boosts Utility Energy Supplies
Based in part on successful findings of tests, in which compressed air was stored in underground aquifers, Central Illinois Public Service engineers are investigating a type of pumped...
Recognizing Liquefaction Hazard
Technique for assessing liquefaction hazard are considered herein: Methods for compiling regional opportunity maps are reviewed and a crude national map is developed. Compilation of regional...
Evaluating Potential Artificial Recharge Projects
The success of an artificial recharge project can be directly tied to the quality of planning of the potential projects and/or sites. The paper's purpose is to identify the...
Effects of the 1985 Earthquake in Lazaro Cardenas, Mich.
An account is presented of a geotechnical survey made shortly after the major earthquake of September 19, 1985 (magnitude 8. 1) at the industrial port of Lazaro Cardenas in the state of...
Courting Public Opinion
Promoting good community relations is an integral part of hazardous waste projects. Before field investigations are conducted, neighboring communities should be advised of the proposed...
Probabilistic Site Strategy for Transmission Lines
A probability-based geotechnical site characterization strategy is presented for transmission line structures. Because site-specific data are sparse for these structures, a Bayesian model...
Construction and Design of Foundations for French Overhead Power Transmission Network
This paper summarizes present conception and design of foundations for 90 to 400 kV overhead lines in France. Firstly principles of geotechnical studies in use are presented: various types...
Investigation of Excavatability in the Piedmont
The lateral and vertical variability of rock weathering in the Piedmont presents significant problems in evaluating the probable cost of excavation for deep basements, pipeline, road cuts,...
Dispersive Soil and its Influence on the Design of Reach 1A of the Tucson Aqueduct?Central Arizona Project
An extensive geotechnical field exploration and laboratory testing program was conducted because of dispersive and erosive soils along the alignment of the canal. The canal design was...
Emergency Response
A spill normally has five phases; namely, the initial emergency response, the site assessment, the development of a remedial action plan, the implementation of the remedial action plan,...
Quantification of Net Shore-Drift Rates in Puget Sound and the Strait of Juan de Fuca
The objective in this study was to determine the annual rate of net shore-drift at selected sites within Puget Sound and the Strait of Juan de Fuca. These sites were selected based on...
Return to search