Environment Exploitation by Prehistorical Population of Rio De Janeiro
The specific purpose of this project was to establish the cultural contexts in the area being studied as well as to define the mechanisms of environmental manipulation that were employed...
Monte Carlo Simulations of Uncertainties in Risk Assessments of Superfund Sites Using Crystal Ball?
Most health risk assessments for Superfund sites combine a series of worst case assumptions to derive a 'point estimate' of risk that is 'conservative,'...
Gamma Exposure from Rn Progeny in GAC Units
An investigation into the gamma exposure rate generated by granular activated carbon (GAC) water treatment units focused on ten sites that covered a range of source radon (Rn) in water...
The Application of Risk Assessment at Hazardous Waste Sites
This paper discusses some of the recent innovative uses of risk assessment at hazardous waste sites. Important developments in both methodology and application are as follows: quantitative...
A Practical Approach for Evaluating Environmental Risk
Risk management and assessment techniques are increasingly being used to project public health risks at hazardous wastes sites. Few studies have quantitatively evaluated the environmental...
Indoor Radon: Site Evaluation
The soil parameters most important in evaluating the indoor radon potential of a building site are the soil radium concentration, the soil-gas radon concentration and the permeability...
Development of a Sanitary Landfill Design in New Jersey?Why Proposed RCRA Changes are Not Going to Affect the Design
On August 24, 1988, the U.S. Environmental Protection Agency (EPA) proposed substantial revisions to Subtitle D of the Resource Conservation and Recovery Act (RCRA). In most states the...
Ft. Huachuca, AZ Fire Site Hazardous Waste Remedial Action
The paper discusses an investigation of the site of a major fire at Ft. Huachuca, Arizona. All of the fire debris contained asbestos. The sampling results confirmed that PCB levels of...
Preacquisition Environmental Site Assessments: Avoiding Common Errors and Omissions
The 1986 Superfund Amendments and Reauthorization Act (SARA) established an 'innocent-purchaser' defense to environmental liability from ownership of contaminated...
Computerized Data Processing, Displays and Groundwater Flow Analyses of the Stringfellow Hazardous Waste Site
Several types of data, maps, and figures were obtained from various sources involved in the investigations and monitoring at the site. This information was discretized, and a computerized...
Weathering of Constituents at Land Treatment Sites
The objectives of this research were to: 1) determine the leachability of metals and organics from soils at hazardous waste land treatment sites; 2) evaluate the mobility of hazardous...
Design and Implementation of a Risk-Based Remedial Action Program for Underground Tank Removal at a Dioxin-Contaminated Site
The unknown or uncertain conditions often inherent in hazardous waste site remediation projects complicate the job of the responsible professional to adequately assess and manage associated...
Geotechnical Aspects of River Bank Erosion
The principal geotechnical mechanisms of river bank failure are identified on the basis of extensive field investigations on many different river systems. The role of each factor depends...
Design, Construction and Testing of Repairs to the Low Level Outlets at Terzaghi Dam
Operation of the low level outlets (LLOs) at Terzaghi Dam in southwestern British Columbia resulted in severe cavitation at operating heads significantly lower than design. Modifications...
Geostatistical Global Estimates and Sampling Design
In the environmental assessment of a contaminated site, several different evaluation criteria could be considered such as: estimation of the overall average contaminant concentration in...
Geostatistics in Estimating Chemical Residuals at a Site
Kriging with generalized covariances is used to evaluate the effectiveness of remediation and cleaning of a contaminated site. The goal is to estimate: a) the amount of total volatile...
Project Evaluation?Don't Miss the Boat
The hydroelectric developer is faced with many decisions during the evaluation stage. These include determining the size of the project, financial analysis to be used, type and number...
An Investigation of a Pumped Storage Hydropower System
In order to provide a realistic basis of determining the viability of a wind-powered hydroelectric system at a potential site, an evaluation technique has been developed. Basically, this...
Rule Curve Operation at Terzaghi Dam to Pass the Probable Maximum Flood
Terzaghi dam is located on the Bridge River, a tributary of the Fraser River. The spillway was originally designed for the 1000-year flood. Probable Maximum Flood (PMF) studies completed...
EPRI's Hydro Relicensing Strategy
The most successful relicensing program is anticipated to involve an aggressive, proactive strategy as follows: select a small, responsive management team to make the decisions concerning...
Return to search