Maintaining Our Goals
Setting goals is easier than achieving them and, once achieved, they must not be viewed as final accomplishments to put behind us - they must be sustained. Although goals are essentially...

Inventorying the System/Inspection Introductory Remarks
A major sewer system evaluation survey is nearing completion in the seven communities which make up Special District No. 1 of the East Bay Municipal Utility District. A major effort has...

On-Line Computerized Maintenance Management
Maintenance is the last cost saving frontier of scientific management. Top management has concentrated on production for generations, largely ignoring maintenance. The attitude of 'fix...

Infrastructure Project Management and the Power of Implementation
The purpose of this paper is to bring renewed attention to project management concepts and public policy implementation issues as they apply to infrastructure development and renewal....

Infrastructure Awareness: Successful Techniques
The need to rehabilitate and upgrade our infrastructure systems, specifically the systems of water supply and distribution, wastewater collection and treatment, bridges, highways and mass...

The National Infrastructure Act
Today, more than ever before, the United States faces a serious problem related to the condition and adequacy of its basic infrastructure - surface transportation, water supply and distribution,...

Quality Control: A Neglected Factor
Quality in construction is too important to leave to chance. A project quality control plan would begin by incorporating testing and inspecting requirements into the specifications. Engineers...

The Pursuit of Quality: QA/QC
Quality assurance and quality control programs are mandated for many federally-funded construction projects. The private sector is also increasingly requiring such programs. The terms...

Concrete Quality Control and Quality Assurance on Strontia Springs Dam
An essential part of the construction management services provided on Strontia Springs Dam was the quality control of material, mixture proportions, and production for all concrete placed...

Environmental Permitting Approaches for Future Development of Offshore Oil Fields in the Arctic
Environmental impact of petroleum prospecting on the North Slope of Alaska is complicated by climatic problems of long periods of low temperature and thick ocean ice. Better engineering...

Design and Model Testing of an Arctic Seawater Intake for Sedimentation and Wave Effects
A seawater intake structure is being designed to provide flood water for tertiary recovery of oil from the Kuparuk oil field near Prudhoe Bay, Alaska. A wave effects study establishes...

An HF CODAR Doppler Transponder System
Gulf Oil Exploration and Production Company completed two major phases in the development of a high frequency (HF) CODAR Doppler transponder system for measuring sea ice motion. The system...

Cost-Effective Arctic Concrete Structures
The economic development of offshore Arctic petroleum fields dictates that Arctic structures be both cost-effective and deliverable with minimum lead time. Concrete structures are typically...

Multi-Truss Design for Tower
A modified structural steel system of outrigger trusses and belt trusses bolster the 54-story Equitable Tower West. Located in New York City, the building's structural system...

Quality Control Management of Real-Time Data
Recent improvements in the real-time acquisition of hydro-meteorological data have raised concerns regarding the quality of the data received. This paper presents several data verification...

Methods for Reliability Analysis of Water Distribution Networks
A detailed review of the literature reveals that there is currently no universally accepted definition or measure of reliability for water distribution networks. The purpose of this paper...

Initial Operation Model for the Central Arizona Project
A microcomputer program for operating uncompleted portions of the Central Arizona Project has been developed. Engineers may use this program daily to assist in scheduling pumping plant...

Nuclear Outages: An Approach to Project Controls
The nuclear refueling outage is short-lived, fast paced, and very costly to the nuclear utility. To better control modification expenses and reduce outage-related costs, utilities are...

Intact Decommissioning Alternative for Nuclear Power Plants
Previous studies of decommissioning options for nuclear power plants have examined potential alternatives such as immediate dismantlement, entombment, and moth-balling. This paper describes...

Coping with Transition: Improving the Management Process
At Arkansas Power & Light Company, the Energy Supply Department has some 2,000 employees and operates (in addition to providing General Office engineering, technical, and administrative...

 

 

 

 

Return to search