Evaluation of Liquefaction Potential of Anderson Ranch Dam
This paper contains a description of a liquefaction evaluation of the alluvial foundation soils at Anderson Ranch Dam, which was performed as part of the USBR's program of...
Dynamic Analysis of Existing Tarbela Intake Towers
According to general practice at the time of the design, the pseudostatic method of applying earthquake loading was used. The basic acceleration was 0. 1g. A post-construction seismological...
Dam Safety Relating to Merwin and Yale Hydroelectric Projects
This paper describes the safety investigations performed to evaluate the dams, associated with the Merwin and Yale Hydroelectric Projects, for the effects of severe floods and earthquakes....
Application of Computer Aided Design and Analysis Tools for Upgrading Existing Power Plant Equipment
This paper presents examples where state-of-the-art computer aided design and analysis techniques have been applied to upgrade hydraulic performance and structural reliability of existing...
Synopsis: Ozark-Webbers Falls Turbine Repairs
The Ozark and Webbers Falls powerhouses were designed and constructed under the supervision of the U. S. Army Corps of Engineers and are located on the McClellan-Kerr Arkansas River Navigation...
Application of an Integrated Numerical System for the Modernization of Hydro Turbines
The modules of an integrated numerical system for the new design and replacement of hydro power plant components are described and some examples of application are shown. The main modules...
Real Time Information Systems for Improved Port Operations
The technology to make appropriate measurements and to forecast conditions for short intervals is available today. Simple collection, analysis and dissemination systems are within the...
Interactive Simulation of Hydropower Systems
This paper describes a new educational technology that has proven extremely effective in introducing both technical and lay persons to the operational principles, management alternatives,...
Hydroelectric Project Design Using Microcomputers
The main issue in the first stage of a hydroelectric project is to assess the influence of hydrologic parameters on design and optimum sizing of the installation and on future energy production....
Hydro Systems Evaluation on Personal Computers
The programs for selecting the equipment and determining the average annual energy have been separated from the detailed financial analysis. The BASIC language was selected for the first...
Microcomputers as Productivity Aids for Small-Scale Hydroelectric Projects
Off-the-shelf software that has been used to improve productivity includes Computer-Aided-Design-and-Drafting (CADD) systems, spreadsheets, project managers, word processors, and communications...
Computer Modeling and Applications
A series of programs is available to evaluate the hydrology, compute the capacity to generate energy, establish unit costs, analyze penstock surge pressures, and simulate ramping rates....
Three-Dimensional Plotting in Dam Potentials
Hydroelectric development is important to many basins in the western United States. Topographical studies are normally used to arrive at sites to be chosen for further investigation of...
Wind Loads on Electrical Transmission Structures
Guidelines for structural loads on electrical transmission structures were prepared by the American Society of Civil Engineers' Committee on Electrical Transmission Structures....
Innovations in Prestressed Concrete Structures
Prestressed concrete poles are probably the best choice for most transmission line structures. They have many advantages over structures made from other materials for both engineering...
Bolted Connections for Steel Towers
Laced electrical transmission towers require on-site assembly. Consequently, the number of bolts and pieces are important considerations in the total cost of the structures. ASTM A394(1)...
TLMRF Research Initiatives
The research initiatives of the EPRI (Electric Power Research Institute) structural development project RP2016-03 are described. The interrelationship of these initiatives with cosponsored...
Strain Gaging and Data Acquisition at the TLMRF
Strain gages are the major source of data for the TLMRF (Transmission Line Mechanical Research Facility) research program. Measurement of member loads and bending moments in lattice towers...
Costs of Truck Related Highway Damage to Alaska
The cost of pavement damage to the State of Alaska for truck traffic continues to be a very controversial topic. There is no simple answer since this cost is dependent upon pavement strength,...
Hot Sand for Improved Traction on Icy Roads
Experiments were performed to determine if heating sand prior to spreading it on icy roads would improve the skid resistance of the road more than cold sanding. Tests were made on a full-scale...